  • Penobscot Bridge Improvements (demolished) - Bangor ME
    The Penobscot Bridge was a steel Baltimore through truss bridge connecting Bangor and Brewer. Construction was completed in 1911 and the bridge was replaced with the current Joshua Chamberlain bridge in 1954. According to the Bangor Daily News, this was the first Public Works Administration (PWA) project in the city. The project involved changing the approach by widening the Washington Street side and rounding off the sharp corners of the bridge which Bangor and Brewer officials considered dangerous. Work was preceded by the Maine Central RR changing its tracks and the telephone company changing some of its cables. Work began in...
  • Hydro-electric Plant - Seward AK
    Public Works Administration project 6279 for an electric plant at Seward was approved 6/20/1934 for a $96,000 loan and a $30,000 grant. Construction finally began 8/6/1937 and was completed 8/7/1939 for a total cost of $136,170. The project proposed a dam and three-mile pipe line from Lost Creek to near the city and the construction of an electric plant "designed to supply practically unlimited power" (Seward will ask $148,000 PWA funds, Jan 9, 1935, p. 1). Stratton and Beers of Juneau placed the PWA bonds. Bennett and Taylor of Los Angles was awarded the contract for the construction of the...
  • CCC Camp SP3 - Fairburn SD
    The Civilian Conservation Corps (CCC) maintained a camp on French Creek east of Custer State Park in South Dakota from 1934 to 1941.  It was officially camp SP-3 (meaning State Park #3).  The recruits worked on projects in region under the supervision of Custer State Park rangers and the National Park Service (NPS). The CCC enrollees built many miles of road, telephone lines and boundary fences. To this they added 20 bridges.  They constructed a fire lookout on Mt. Coolidge, along with a ranger's residence there, and fought fires and bark beetle infestations. They developed the Blue Bell Lodge and cabins...
  • Lake Placid Middle High School - Lake Placid NY
    In 1922, due to increasing numbers of students, the Lake Placid school district constructed a large brick high school at the south end of the current middle high school. It was modern and fireproof, sitting on the hill overlooking athletic fields and Main street. In November 1933, again due to increasing numbers of pupils, the community members voted to increase the school size by building two more sections. The original brick building was incorporated as the south end of the newly completed high school, now having three main sections, all finished with a Palladian neoclassical façade. A plaque indicating that...
  • L. C. Hatcher Elementary School - Lucedale MS
    The one-story Art Deco school building currently used as the elementary school was constructed as Public Works Administration project 4789 as the new high school in Lucedale. The project was approved 3/7/1934 for a loan of $30,500 and grant of $10,295. Construction began 6/26/1934 and was completed 2/8/1935 for a total of $40,902.
  • Water Works - Magnolia MS
    Public Works Administration project 5487 was approved 4/4/1934 for water works project in Magnolia. The city received a loan of $10,500 and grant for $3,874 to improve the water works system constructed in 1905. Construction began 7/9/1934 and was completed12/22/1934 for a total of $14,381.
  • Red Banks Drainage District -Marshall and DeSoto Counties MS
    The Reconstruction Finance Corporation provided 22 loans to drainage districts in Mississippi in 1934, totaling $2,726,150. The Red Banks district received $26,000. From the Coldwater River, Byhalia Creek, Red Banks Creek, and a canal 11 miles long ran through the counties of Marshall and Desoto, and into the Pigeon Roost Creek and Pigeon Roost Drainage Canal.
  • Cooper Spur Trail Shelter - Mt. Hood National Forest OR
    As recorded in a discussion of the Mount Hood National Forest in the US Forest Service publication  The Forest Service and the Civilian Conservation Corps: 1933-1942: "The Cooper Spur Trail Shelter was one of several shelters built by the CCC along the Timberline Trail. It was probably built by the Cooper Spur Camp, a side camp of Camp Wyeth at Cascade Locks. The native stone shclter is located on the Hood River Ranger District, about 1 mile south of theCloud Cap Inn and 50 yards from the intersection of the Timberline Trail and Trail 600-A. The 12 x 12-foot shelter was built...
  • Elementary School (former) - Monticello MS
    Public Works Administration project 4726 for an elementary school building was approved 3/21/1934 for a $20,000 loan and $8,232 grant. Construction began 6/18/1934 and was completed 5/29/1935. The Colonial Revival style building was designed by Edgar Lucian Malvaney and constructed by Currie and Corley. The former school was listed as a Mississippi Landmark and the Lawrence County Historical Society began work toward restoration and renewed use of the building.
  • Water Works System - Sardis MS
    Public Works Administration project 4251 was approved 12/28/1933 for a water works system in Sardis. A loan $14,257 and grant of $5,342 was announced in December 1933. Construction began 6/12/1934 and was completed 8/28/1934 for a total of $19,599.