  • Charity Hospital Improvements - Natchez MS
    A $15,000 improvement project was allotted for Natchez Charity hospital, the oldest charity hospital in Mississippi, for main building and nurses’ home. The hospital was constructed 1849-1852, 3.5 stories, and was destroyed by fire in 1984. It became the Natchez Charity Hospital in 1890s.
  • Charity Hospital Improvements - Vicksburg MS
    $4,600 project was allotted for Vicksburg Charities hospital for main building and nurses’ home renovations in 1934. The building that began as the city hospital in the 1840s because a state institution around 1871, operated from a former plantation mansion. It closed in 1989 following numerous renovations/alterations. It was demolished February 2019.
  • Tumacácori National Historical Park: External Walls & Facilities - Tumacácori AZ
    The Tumacácori National Monument was set aside by President Theodore Roosevelt in 1908 to protect the ruins of the Mission of San Jose de Tumacacori.  In 1918, it came under the administration of the National Park Service and its regional 'custodian', Frank Pinkley.  Congress created the Tumacácori National Historic Park in 1990, adding the ruins of two nearby missions, Los Santos Angeles de Guevavi and San Cayetano de Calabazas. Under the park service's guidance, Tumacácori mission church and its dependencies were stabilized in 1920-21, but intentionally not fully restored.  Only with the aid of the New Deal did the park come...
  • University of Mississippi Improvements - University MS
    The CWA and ERA completed repairs and improvements in state institutions across Mississippi in 1934 and 1935. At the University of Mississippi, the interior and exterior of two women's dorms were painted, music hall and campus residence were repaired and repainted, and six other buildings improved. In addition, a new warehouse was constructed, fence, walks and press booths for the athletic field added, drainage structures installed across campus, 525 feet of sidewalk laid, and a dorm destroyed by fire was razed and material salvaged. The total expenditure for the work was $24,043.23.
  • School Improvements - Pickens MS
    Project 5092 to install a heating system for the Pickens school was completed in 1934. The Pickens school, originally constructed 1916, was a 2-story building destroyed in 2003. PWA provided a grant of $307 for the heating system. It was approved 6/20/1934, construction initiated 9/18/1934, and completed 9/27/1934 for a total cost of $1121.
  • Colossal Cave Mountain Park: Cave Access - Vail AZ
    The Civilian Conservation Corps (CCC) carried out major work at Colossal Cave and the surrounding park north of Vail AZ (now a suburb of Tucson, but far to the east in the 1930s). They improved access for visitors to the cave itself, built a large visitors'/administration center, laid out a campground and picnic area, opened roads and trails and built a water supply system.  The Arizona State Park Service oversaw the work. Work inside Colossal Cave included widening the entrance and passageways, installing rock walkways and handrails, and added lighting and a water pipeline. This work was done in 1934-37 by...
  • Boswell Regional Center: Mississippi State Tuberculosis Sanatorium - Magee MS
    In a state-wide program to renovate and improve Mississippi institutions, the State Tuberculosis Hospital, using relief labor and ERA funding, carried out extensive painting and repairs and improvements in 1934-1935. $23,844.80 was expended on interior, exterior painting, floor refinishing, plastering, and new construction. Buildings improved included the two infirmary buildings, six smaller buildings including convalescent wards, nurses home, doctors apartments, staff residences, Preventorium, and service building. The carpenter shop, dairy barn, laying houses, and brooder were constructed. The Preventorium and some residences are still extant, but most other buildings have been demolished. The remaining buildings are used as the Boswell...
  • Industrial and Training School - Columbia MS
    The Industrial and Training School in Columbia housed juvenile offenders from the early 1900s through 2008 when it was closed. Begun in March 1934, the state legislature appropriated $200,000 to supplement CWA funds for building repairs on Mississippi institutions. Work was delayed due to delay in the CWA funds. Approval was eventually received to use ERA funds. The largest expenditure was for the Industrial and Training School at Columbia, where $49,783.98 was spent on buildings and grounds improvement. Work included rebuilding the water supply system, new reservoir, repair and painting of water tank. Repairs were completed on Franklin Hall and...
  • State School for the Deaf Improvements - Jackson MS
    The State School for the Deaf, originally constructed 1906-1908, removed a wall and rebuilt one wing on the east wing in order to correct surface drainage damaging the wall. The project, financed by ERA and the state legislature replaced glass, plastered walls, and updated electrical and plumbing systems for a total cost of $39,938.25. The facility was demolished in 1951 following the construction of a new school.
  • State School for the Blind Boys Dormitory - Jackson MS
    The boys' dormitory at the State School for the Blind was designed by architects Hull & Drummond in 1934 as part of a $220,000 project using state funds and ERA funds with WPA labor. The new brick 2-story dormitory was constructed to relieve crowded conditions at the school, and cost in excess of $40,000. An additional $3,587 was awarded in September 1935 in order to complete the dormitory. It was used in the Gilfoy School of Nursing after the school relocated in the late 1940s, and was demolished c. 2005 in order to build a parking lot.