  • Bull Lake Dam - Wind River Indian Reservation WY
    "Riverton Project, Wyoming - Bull Lake Dam, an 800,000 cubic yard earth and rock fill structure is under contract and is scheduled for completion in January 1938. Some canal and lateral work will probably be done in 1937. H. D. Comstock is superintendent." "The earthen dam was constructed between 1936 and 1938 by the United States Bureau of Reclamation with a height of 81 feet. It impounds Bull Lake Creek for irrigation storage and flood control, as part of the Riverton Unit of the extensive, multi-state Pick–Sloan Missouri Basin Program. The dam is owned by the Bureau and is operated by...
  • Grove Street Bridge and Paving - Burlington VT
    The W.P.A. constructed a bridge on Grove Street (crossing Centennial / Catlin Brook) in 1938. The bridge has been largely rehabilitated and rebuilt such that little of the original structure is apparent. However, though "budget and time constraints prevented a full restoration of the Grove Street Bridge, the original structure was never removed and its components still remain in situ. Today, an adventurous visitor to the bridge can spot the original brick by peering behind the rocks and other materials installed around the new culvert." The WPA also paved Grove Street as part of a separate project. WPA Project No. 465-12-1-15 (bridge) WPA...
  • Inspection Station (former) - Porthill ID
    The historic former U.S. Border Inspection Station (and attendant garage facility) on State Route 1 in Porthill, Idaho was built in 1938 with U.S. Treasury Department funds. Living New Deal believes the structure has been demolished and replaced with a newer facility.
  • J.J. Richards Band Shell - Pittsburg KS
    "The J.J. Richards Band Shell was built during 1936 and 1937 by the WPA."
  • Owen Park Bandshell - Eau Claire WI
    The Donald "Sarge" Boyd Bandshell was constructed at a cost of $10,000 in 1937-38 from funding provided by the Works Progress Administration (WPA). The Bandshell is located in Owen Park ...
  • CCC Forestation Project at Calabash Boom - St. John VI
    The CCC carried out a forestation project that involved planting hardwood trees at Clabash Boom, at Johnson Bay on St. John.
  • Marley Homes - Frederiksted, St. Croix VI
    "Marley Homes at Frederiksted, St. Croix Island. An undeveloped plot of 17 acres dedicated by the municipality is the site of this development. A series of 1-story row houses provide 70 rooms arranged in 38 family-dwelling units. The structures cover 2 ½ percent of the site area." “By arrangement with the United States Housing Authority, the administration of the three low-cost housing projects erected in the Virgin Islands by the PWA Housing Division has been turned over to the government of the Virgin Islands. This arrangement has made it unnecessary to establish an expensive management organization and has therefore permitted the...
  • CCC Senior Camp - St. John VI
    The Annual Report of the Governor of the Virgin Islands for 1938 describes the establishment of new camp facilities on St. John: "During the year, a side camp was established on the island of St. John, where there are now 26 persons enrolled in the senior camp."
  • Protestant Cay Residence Reconstruction - St. Croix VI
    “Protestant Cay residence, St. Croix. The reconstruction of this attractively located and interesting structure was completed except for certain minor details and except for the reconstruction of adjacent outbuildings. This residence will be made available as quarters for an officer of the government of the Virgin Islands.” The work was executed by the WPA and cost $ 6,000.
  • Caballo Dam - Truth or Consequences NM
    "Caballo Dam, Rio Grand Project, New Mexico -- Caballo Dam on the Rio Grande is now being constructed by the Bureau to provide (1) flood control and river regulation, (2) the development of firm power at Elephant Butte Dam, and (3) additional storage for the Rio Gande Irrigation Project. Construction of the dam was commenced in June 1936 and is scheduled for completion in May 1938. It is a 1,250,000 cubic yard earthfill structure with a maximum height of 90 feet and a total length of 4,500 feet. The reservoir will have a storage capacity of 350,000 acre feet of...