  • Bragg City School - Bragg City MO
    This small linear school was constructed as a PWA project in 1937. It features two gabled ends with a carved rock symbol of a lamp of knowledge. It is very similar to other schools of similar size in Missouri and presently is a private residence.  
  • Gideon High School - Gideon MO
    This long, linear high school was constructed as a PWA project in 1937. It is still in active use and in very good condition having been well-maintained.
  • School Rock Wall - Doniphan MO
    There was a PWA built school addition within the Doniphan school campus built in the mid-1930’s, however there is no evidence of that older school.  Surrounding the current schools, however, is this well-built rock wall that retains the plaque indicating that it was built by the WPA from 1936-1937. Most of the wall is in very good condition.  Portions have been removed for construction purposes on the northwest side.
  • Water Conservation Dams - Ainsworth NE
    In December 1934, Federal Emergency Relief Administration (FERA) labor was busy building two water conservation dams in Brown County northwest of Ainsworth. The dams were built on the farms of Mr. L. D. Crawford and Mr. Fred Wallenstein. Five additional dams were planned for other farmsteads in the Buffalo Flat section of the county. The applicant paid for materials and the labor was funded by the reemployment office.
  • Fire Lookout Tower - Briar MO
    This fire lookout tower outside Briar was a New Deal project completed in 1936. It was almost surely built by the Civilian Conservation Corps (CCC) under the direction of the US Forest Service, but that needs to be confirmed. The tower design is typical of the era. The Briar Lookout is intact, including a stairway extending to the ground. Access is restricted by a surrounding high chain link fence topped with barbed wire for safety reasons. It is one of the southernmost lookout towers in Missouri.  
  • Oak Fire Lookout Tower - Poplar Bluff MO
    This fire lookout tower was constructed as a New Deal project in 1941, potentially by the CCC. It is in reasonably good condition though it is no longer in use and the initial stair has been removed for safety reasons.
  • Knob Lick Fire Lookout Tower - Knob Lick MO
    This lookout tower was built as a New Deal project, potentially by the CCC, but the agency in charge is not known definitively. The tower is accessible about halfway up to an observation platform and is about 1 mile off of Hwy 67. Views from the platform are excellent in all 4 quadrants. There are no associated outbuildings.
  • Stone Bleachers and Perimeter Wall - Fredericktown MO
    The CCC built bleachers and a surrounding rock wall for Fredericktown's high school baseball diamond. The project features a tall rock wall with periodic columns for strength that is capped with concrete. It surrounds 3 sides of a large baseball field. One of the corners has a curved façade.
  • Lincoln Park Picnic Tables - Oklahoma City OK
    From Waymarking.com: "Lincoln Park is a large area on the east side of Northeast Lake and the Oklahoma City Zoo. The CCC was responsible for the construction of the lake, and several buildings in the zoo were constructed by the CCC and WPA. In Lincoln Park, there are dozens of picnic tables built by the WPA in 1936, located throughout the wooded picnic areas. They are actively used by the citizens of Oklahoma City. They consist of a rusticated native sandstone cube on top of which is a poured concrete table top. Each table has four seats which have a rectangular...
  • Swimming Pool - Neligh NE
    In December 1936, Mayor R. G. Kryger received word that the city’s proposal for a swimming pool had been approved by the Works Progress Administration (WPA). The proposed pool would measure 146 by 60 feet, and would be constructed of concrete. The project would also include a bath house measuring 32 by 68 feet and a filtration system. The WPA had committed $6,225.00 on labor and $1,809.50 on supplies and materials. The city of Neligh would be required to furnish materials and supplies in the amount of $6,275.91. The total cost was anticipated to be $14,510.41. Neligh would have to...