  • Rural Electrification - Blachly OR
    The Western Construction News of June 1937 notes REA work in rural South West Oregon. " The REA has alloted $108,000 to the Blachly-Lane County Cooperative Electric Association, Blachly Oregon, for construction of 87 miles of transmission lines in Lane County Oregon." Lane county in 1930 was very sparsely populated with only 54,493 people. "In 1934, one of the first people's utility districts in Oregon was formed, Lake Creek Public Utility District. But before the state and federal governments acted on the application, the Rural Electrification Act was passed and members of the Lake Creek PUD voted to go with the Rural...
  • Fresno Dam - Havre MT
    "Chain Lakes Project - Montana - Contract for the construction of Fresno Dam across the Milk River has been awarded but no work will be done until the spring of 1937. The dam, for storage and flood control purposes, is of the earth and rock fill type. It will be about 80 feet high and 2,000 feet long, and will contain 1,870,000 cubic yards of material. The storage capacity will be 126,000 acre feet."
  • Ethan Allen Park Pinnacle Lookout House - Burlington VT
    The Works Progress Administration constructed a stone masonry lookout house at the pinnacle of Ethan Allen Park in 1938.
  • Ethan Allen Park Entrance - Burlington VT
    The Works Progress Administration (W.P.A.) constructed a masonry entrance at the south end of Ethan Allen Park. The W.P.A. also widened the entrance to 26 feet (W.P.A. Project No. 65-12-344).
  • Tacoma Water Supply - Ravensdale WA
    " Tacoma Water Supply Program for 1937 The Water Division of the City of Tacoma has plans completed for a construction program during 1937 amounting to $1,566,000. An application for a $705,000 PWA grant on this project has already been made. This program includes: construction of a 160x244 foot reinforced concrete building for stores and shops; reconstruction and metering of 21,160 flat-rate water services; construction of a Tide Flat trunk main extension consisting of 10,800 feet of 36 inch steel pipe, 1200 feet of 28 inch steel pipe, and 3625 feet of 24 inch steel pipe, with all appurtenant equipment; and...
  • Mad River Water Supply Project - Eureka CA
    The Public Works Administration (PWA) funded part or all of a major 6-mile long pipeline for the Mad River Water Supply Project.  The pipeline contract was awarded the United Concrete Pipe Corporation of Los Angeles in 1937 for $775,695.] According to the Eureka Times-Standard (Oct 7, 2016), " a 20-year project to build a parallel pipeline was being completed as a failsafe in case the old New Deal era pipes failed. The system goes from a pumping station on the Mad River north of Arcata to the filtration system in Eureka's water treatment facility on W and Hemlock St. The survey company...
  • Inspection Station - North Troy VT
    The historic U.S. Border Inspection Station on State Route 243 in Troy, Vermont was built in 1937 with U.S. Treasury Department funds. A newer facility has been built by the New Deal structure.
  • J.J. Richards Band Shell - Pittsburg KS
    "The J.J. Richards Band Shell was built during 1936 and 1937 by the WPA."
  • Owen Park Bandshell - Eau Claire WI
    The Donald "Sarge" Boyd Bandshell was constructed at a cost of $10,000 in 1937-38 from funding provided by the Works Progress Administration (WPA). The Bandshell is located in Owen Park ...
  • CCC Forestation Project at Calabash Boom - St. John VI
    The CCC carried out a forestation project that involved planting hardwood trees at Clabash Boom, at Johnson Bay on St. John.