  • Jordan High School – Los Angeles CA
    Jordan High School (formerly David Starr Jordan High School), established in 1925, was rebuilt with funding from the Public Works Administration (PWA). The work was completed in 1935. The PWA allocated $9,380,000 to the Los Angeles Unified School District (LAUSD) in January 1934 for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake. One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Jordan High School's five original buildings, the Los Angeles Conservancy writes, were retrofitted and renovated "with a unifying PWA Moderne style....
  • CCC Camp Gap Ranch (former) - Burns OR
    From 1934 to 1942, CCC Camp Gap Ranch operated in Harney County under the direction of the US Grazing Service, the precursor to the Bureau of Land Management (BLM). Enrollees at this 200-person Civilian Conservation Corps provided labor on projects designed to manage range land. As noted in a BLM brochure, this included building range improvements such as fences and reservoirs, drilling wells, building roads, and cutting large quantities of juniper posts for fencing projects. CCC Camp Gap Ranch (DG-5) was one of seven Civilian Conservation Corps camps established in Oregon to work with the US Grazing Service in the implementation...
  • 75th Street Elementary School – Los Angeles CA
    Seventy-Fifth Street Elementary, which opened in 1922, was rebuilt with a grant from the Public Works Administration (PWA). The work was done sometime in 1934-35. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Seventy-Fifth Street Elementary was one of three schools in the city to receive an outright grant.  It was awarded $24,000, while Huntington Park Elementary School received $7,000...
  • Dog Pound (demolished) - Salt Lake City UT
    This fireproof structure replaced makeshift quarters previously occupied and that had been subjected to much criticism. Here the impounded animals could be kept in comfort until humanly destroyed or claimed (from Jessen). The local Civil Works Administration contributed $2206.10 against a total project estimate of $4627.30. The building has since been demolished.
  • Agency Valley Dam - Vale OR
    The U.S. Bureau of Reclamation authorized construction of the Agency Valley Dam, on the North Fork of the Malheur River, in 1933. The Hinman Brothers, of Denver, began work on the 110 foot high, earthen structure in March 1934 and the project was completed in December 1935. The reservoir capacity of the dam project is 59,200 acre-feet. Authorization of the dam was based on the needs of the Vale Project, an irrigation and water control plan serving the Malheur River area. It is the second of three dams serving the project and the only one constructed during the Depression. The Warm...
  • Columbia Slough (improved) - Portland OR
    From late December 1934 through early spring 1935, the State Emergency Relief Administration (SERA) funded improvements to the Columbia Slough that involved raising and leveling a dike on the slough's channel approximately 1.5 miles east of Faloma station. While improving the Columbia Slough dike, it provided work to approximately 190 men for 70 days as part of a work relief program. The City's project description notes the following need: "Dredging operations on this locality had deposited many thousands of yards of excavated material on the banks of the slough. This material was continually sluffing back into the channel. The project consisted...
  • Road Improvements: SE Holgate & SE 32nd Avenue - Portland OR
    During the hard winter months of 1933-1934, the Civil Works Administration (CWA) was a work relief program that employed Portlanders on a variety of needed projects. Road work was one such project category. These men are shown graveling SE Holgate near SE 32nd Avenue on February 1, 1934. The CWA served as a federal relief program from November 8, 1933 through March 31, 1934. When the CWA began, Oregon anticipated being able to put 21,000 men back to work on small projects involving a large amount of hand labor. The projects were submitted for approval to the CWA and the jobless...
  • Duniway Park (improved) - Portland OR
    Although Duniway Park was founded in 1918 to serve residents in south Portland, improvements had been limited and those who used it complained of the odors associated with the landfill that originally established the playground area. In 1934, the Oregon's State Emergency Relief Agency (SERA) authorized funds to improve the park. SERA was funded by the Federal Emergency Relief Act (FERA) during 1934-1935. FERA operated from May 12, 1933 through 1935 when it was replaced by the Works Progress Administration (WPA) as the New Deal's primary work relief program. One of the city's major newspapers, The Oregonian, reported that the SERA funded...
  • Goldsmith-Schiffman Field - Huntsville AL
    In 1934, the Civil Works Administration started building a modern sports field on January 29 due to the land donated to the city on January 25, 1934, by Oscar Goldsmith, Lawrence B. Goldsmith, Annie Schiffman Goldsmith, Robert L. Schiffman, and Elsie Strauss Schiffman for use as an athletic field or playground for white pupils of the public schools. Due to CWA changes, they could only provide 50 people to begin the project. The area was the first in Huntsville to be lit up for nighttime sporting events, and it cost the city $6,500 to build, thanks to funding from the...
  • Mountainair Municipal Auditorium - Mountainair NM
    The Federal Emergency Relief Administration (FERA) and the Works Progress Administration (WPA) built the Mountainair Municipal Auditorium in Mountainair, NM between 1934 and 1936. Local architect-builder Everett Grist designed the structure. Presently, the auditorium operates under the name Robert J Saul Recreation Center since 1993.  