• Utah State University: Family Life Building - Logan UT
    The Public Works Administration (PWA) funded the construction of the Home Economics building at the Utah State University. The structure was built in 1935-36 and designed by Leslie Hodgson & Myrl McClenahan.  It is a two story, yellow brick, Moderne structure with bas-relief columns between every set of windows, white decorative elements capping the columns, and a slightly projecting entrance with somewhat gothic windows over the doors. According to a USU Historical Buildings guide, “On October 18, 1933 the federal Public Works Administrator announced allotments in excess of ten million dollars for non-federal projects. As part of the allotment given to the...
  • Price Street Sidewalks - Kingwood WV
    The Works Progress Administration built sidewalks on several streets in Kingwood. Work on Price Street was completed in 1937.
  • Brown Avenue Sidewalks - Kingwood WV
    The Works Progress Administration built sidewalks on several streets in Kingwood. Work on Brown Avenue was completed in 1937.
  • Lincoln Memorial: Repairs and Snow Removal - Washington DC
    On May 26, 1933, Lieutenant Colonel U.S. Grant III, grandson of President Ulysses Grant and director of the Office of Public Buildings and Public Parks of the National Capital, presented a large public works program for Washington, DC, “in anticipation of the early passage of the national industrial recovery act.” In the report, a request was made for $6,890, “For cleaning and pointing up interior stonework at the Lincoln Memorial… to prevent further deterioration” (Evening Star, 1933).  Ultimately, the Public Works Administration (PWA), created as part of the NIRA in 1933, allotted $3,465 for the job (about $69,000 in 2019 dollars)...
  • Leiter Estate Landscaping - Washington DC
    The Civilian Conservation Corps built park amenities and landscaped portions of the Leiter Estate in 1936-1937. A National Parks Service/Historic American Buildings Survey report describes the nature of the work performed by the CCC: “Upon acquiring the Leiter estate, the NPS planned to turn the acreage ‘into a public recreation area...form a section of the George Washington Memorial Parkway.’ Enrollees from Camp NP-6-VA (Fort Hunt) engaged in ‘selective cutting to open up desirable vistas of the river.’ In addition to creating view sheds, they further enhanced visitor amenities with the construction of 2.5 miles of foot trails and fifteen table-and-bench combinations,...
  • College of Charleston Student Activities Building/Gymnasium - Charleston SC
    On 27 October 1937, the Radcliffe-King House was pulled down for the new College of Charleston Student Activities Building/Gymnasium building. The new building was funded by the Federal Emergency Administration of Public Works, and was designed by Simons & Lapham, a well known Charleston, South Carolina architectural firm, which participated in may New Deal projects. The building included some rooms for dorms for out of county basketball players who attended the    College of Charleston. See Blevins (2001): https://livingnewdeal.org/wp-content/uploads/gravity_forms/5-1524db4e8f93549db7fec5d73ae429b8/2018/01/CofC-Gym-pages-98-101.pdf In 1994-1995 the building was renovated. The gymnasium’s rubber basketball floor was removed for a modern floor, an indoor walking track was suspended from the ceiling,...
  • The White House: West Wing Expansion - Washington DC
    In 1934, the Public Works Administration (PWA) funded the expansion of the White House West Wing, which houses the Executive Offices of the President of the United States.  The West Wing contains the Oval Office, Cabinet Room, Situation Room, and Roosevelt Room.  The West Wing's four floors also contain offices for the vice president, chief of staff, counselor to the president, the senior advisor to the president, the White House press secretary, and their support staffs. There had been three expansions of the West Wing prior to the New Deal, in 1902, 1909 and 1929, but this one was the most thorough-going. When Franklin...
  • Appalachian Trail: Final Link - Carrabassett Valley ME
    The Civilian Conservation Corps completed the final link of the Appalachian Trail in Carrabassett Valley near Sugarloaf Mountain, on August 14, 1937. A plaque near the site reads: "In honor of the men of the Civilian Conservation Corps who, from 1935-1939, contributed greatly to the completion of the Appalachian Trail in Maine and who, on August 14, 1937, near this spot completed the final link of the entire 2,054-mile trail. Dedicated August 14, 1987 by the volunteers of the Appalachian Trail Club."
  • Arizona State Hospital Additions - Phoenix AZ
    The Works Progress Administration built additions for the Arizona State Hospital (also known as the Arizona State Hospital for the Insane) in Phoenix. The present condition of the structures in unknown to the Living New Deal.
  • Ocmulgee National Monument: Footbridge - Macon GA
    CCC work at Ocmulgee National Monument included: "preparing trails, including a bridge between the museum and Earthlodge that has become a local landmark." While the wood surface of the bridge has been replaced, the stone base supports are original.