1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 22
  • La Puente High School - La Puente CA
    The WPA demolished and reconstructed a building at a high school in La Puente. Exact location and current status of the school are unknown. There are currently three high schools in La Puente.
  • La Purisima Mission State Historic Park: Painting and Sculpture - Lompoc CA
    As part of the New Deal reconstruction of Mission La Purisima, the Federal Arts Project (FAP) of the Works Progress Administration (WPA) was asked to send in professional painters to finish the interior of the buildings. In 1938, FAP artists were employed in painting the pulpit and railing in the chapel of the padres' residence building, under the supervision of Douglas Parshall of Santa Barbara (Savage, p. 151).  in 1940, artist Harry Hemle got the job of decorating the interior of the completed church.  Hemle painted the walls, alter decorations and pulpit, with the assistance of two Civilian Conservation Corps (CCC) enrollees...
  • La Purisima Mission State Historic Park: Seegert Fountain - Lompoc CA
    As part of the New Deal reconstruction of Mission La Purisima, Helen Seegert created a concrete fountain at the east end of the complex in 1936.  It was paid for by the Federal Arts Project (FAP) of the Works Progress Administration (WPA).
  • Lafayette Building - Washington DC
    The Lafayette Building was the home of the Reconstruction Finance Corporation (RFC), an important funding agency created by Herbert Hoover in 1932 and then greatly expanded by Franklin Roosevelt during the New Deal years.  The RFC held an important financial role in America all the way through World War II The Lafayette Building was built in 1939-1940 with private funding, through a newly-created Lafayette Building Corporation (LBC). However, the RFC “was directly involved in planning the building that would be their headquarters… The RFC Mortgage Company purchased the Lafayette Building Corporation's outstanding stock on April 16, 1941, and a month...
  • Lafayette Elementary School - Long Beach CA
    The 1933 Long Beach Earthquake destroyed hundreds of schools throughout Southern California. Established in 1926 (as Chestnut Avenue Elementary School), Lafayette Elementary School was rebuilt in 1936 with New Deal funding. “On August 29, 1933, Long Beach citizens approved a $4,930,000 bond measure for the rebuilding of schools. Applications for approximately thirty-five schools were filed with the Works Progress Administration (WPA) and Public Works Administration (PWA); federal grants up to thirty percent of labor and material costs were obtained. To minimize costs, building materials were salvaged from damaged buildings, some schools were rehabilitated, and new schools were constructed with basic amenities...
  • Lafayette Junior High School (former) – Los Angeles CA
    The former Lafayette Junior High School, which opened in the 1920s, was rebuilt with funding from the Public Works Administration (PWA) in 1936. Reconstruction was carried out by architect Arlos B. Sedgley and general contractor Monolith Construction Company. The Los Angeles Union School District (LAUSD) closed the school in 1955 due to decreases in student enrollment. The property is now used as a LAUSD maintenance plant. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake. One hundred and thirty schools would benefit from...
  • Laguna Beach High School Expansion- Laguna Beach CA
    In 1936, the New Deal funded a new gymnasium and a classroom for Laguna Beach High School. Laguna Beach High School was founded in 1934. It repurposed former Laguna Beach Elementary School buildings which were built in 1928. The New Deal funded gymnasium still stands today.
  • Laguna Beach Sewage Disposal Plant (former) - Laguna Beach CA
    The Laguna Beach Sewage Disposal Plant was funded by both local bonds and the Public Works Administration (PWA).  Construction started in 1934 with the help of relief labor from the Civil Works Administration (CWA).  The sewage treatment plant used a distinctive architecture that sets it apart. Laguna Beach considers the buildings to have local historical significance.   Although the plant is no longer used, the distinctive tower of the 'digester' remains. As the following 2006 archaeological report documents: “Little remains of the original immediate landscape of the sewage treatment plant, since its adjacent filtration and settling ponds have been removed .... However, the adjacent...
  • Lake - Gitano MS
    A chain of lakes for the hill counties of Mississippi was proposed in 1936 by Si Corley, director of conservation of the State Game and Fish commission. Funds from the Works Progress Administration (WPA) in concert with the sponsorship of the Game and Fish commission began the construction of a series of lakes adjacent to cities in the hill counties including a small artificial lake near Gitano. Exact location is unknown.
  • Lake - Pelahatchie MS
    A chain of lakes for the hill counties of Mississippi was proposed in 1936 by Si Corley, director of conservation of the State Game and Fish commission. Funds from the Works Progress Administration (WPA) in concert with the sponsorship of the Game and Fish commission began the construction of a series of lakes adjacent to a number of hill county cities including at Pelahatchie. Corley pointed out that in addition to providing sites for outdoor sports, when fully stocked, the lakes could produce 2,000 pounds of fish per acre each year. In addition, they would be migratory bird sanctuaries. The...
  • Lake - Raymond MS
    A chain of lakes for the hill counties of Mississippi was proposed in 1936 by Si Corley, director of conservation of the State Game and Fish commission. Funds from the Works Progress Administration (WPA) in concert with the sponsorship of the Game and Fish commission began the construction of a series of lakes adjacent to several hill county cities including Raymond. WPA workers constructed the lake about one mile from Raymond. Corley pointed out that in addition to providing sites for outdoor sports, when fully stocked, the lakes could produce 2,000 pounds of fish per acre each year. In addition,...
  • Lake Bogue Homa - Laurel MS
    Mississippi State Game and Fish Commission sponsored the Works Progress Administration to create a number of lakes for recreation purposes. Near Laurel, Lake Gates was approximately 1500 acres, fed by the Boguehoma Creek. The project began in 1936, and was completed in 1939. At some point by 1947, the name had been changed to Lake Bogue Homa. The lake remains an active fishing location and has been improved over the years.
  • Lake Flower Dam - Saranac Lake NY
    The Works Progress Administration (WPA) constructed the Main Street Dam at the head of Lake Flower in Saranac Lake NY between 1937 and 1938. The WPA allocated funds for a number of proposed improvements in and around Ogdensburg, including “the construction of a new dam…and the development of a picturesque bathing float, beach, park site and addition of buildings to Saranac Lake Craft and Study Guild” (Parks & Recreation). According to a contemporary news report, the dam was “placed…on the site upon which Capt. Pliny Miller once built a sawmill. Later it was taken over by Alonzo Blood…who organized Saranac Lake’s...
  • Lake Tangipahoa - McComb MS
    Preliminary work on one of the largest earth dams to be constructed by the Civilian Conservation Corps enrollees in the south began with the clearing of the site for a 540-acre lake along the Tangipahoa river. Excavation began July 1, with work on the dam construction planned for mid July. Plans called for a barrier of 100,000 cubic yards of earth, spillway 300 feet wide and 800 feet long. The work was on Highway 48, five miles southwest of McComb. Engineer was George Long supervising the local crew of the Civilian Conservation Corp enrollees. Lake Tangipahoa was adjacent to the...
  • Lakeside Gymnasium - Chisago City MN
    The Lakeside School was built in 1918 in Chisago City, MN. The original school was not built with an auditorium or anywhere for entertainment, plays, etc. and after 30 years the gymnasium in the school had fallen into disarray and many schools in the area refused to play in the gym that had a narrow floor, low ceiling, and no room for spectators. In 1934 the WPA selected Chisago County among 13 other counties to receive a WPA project. The school board submitted an application for federal aid in August of 1938 to make improvements to the school. In September...
  • Lane Tech College Prep Auditorium Fire Curtain Mural - Chicago IL
    A 43' x 20' oil mural was painted on the steel fire curtain in the auditorium at Lane Tech High School by artist John Edwin Walley. It was installed in 1936 with funding from the WPA's Federal Art Project and restored in 1997. One commentary on the mural says this: "The imposing Native American figure called "the lean Indian," painted on the steel fire curtain of the school auditorium, was the first of many artworks to be commissioned for Lane Tech, then all male, during the New Deal years. The school had moved to a new building in 1934, and Lane's principal...
  • Lane Tech College Prep Bas Reliefs - Chicago IL
    Among several other New Deal artworks at the Lane Tech High School are these carved mahogany bas-reliefs in the school library. These 15' x 6' reliefs were carved by sculptor Peter Paul Ott, with assistance from wood workers Conzelman, Meuzenmeier, Sarner, Ericksen and McGrory. The reliefs were completed between 1936 and 1938 with support from the WPA Federal Art Project.
  • Lane Tech College Prep High School Auditorium Mural - Chicago IL
    Among the many Federal Art Project (FAP) funded artworks at Lane Tech High school is a four-panel fresco in the auditorium, "Teaching of the Arts," painted by Mitchell Siporin in 1938. Each panel is 15' x 3'6." From A Guide to Chicago's Murals (2001): "Four vertical panels mounted between the exterior doors of the Lane Tech auditorium describe the teaching of the humanities. They were painted when the school was all male. In each, Mitchell Siporin portrays the figure of a mentor or teacher standing behind that of a young student. For literature, a wise-looking older man with his arm outstretched gently...
  • Lane Tech College Prep High School Lunchroom Murals - Chicago IL
    Among the New Deal artworks at Lane Tech High School are several frescoes in the school lunchroom, each depicting a different period of "Epochs in the History of Man." These large (12' x 14') frescoes were painted by Edgar Britton in 1937 under the Federal Art Project (FAP), a branch of the Works Progress Administration (WPA).
  • Lane Tech College Prep High School Sculptures - Chicago IL
    Two 14-foot figures titled "Boys Rising From the Sea" were created by Charles Umlauf under the auspices of the WPA Federal Art Project.  These sculptures are placed in front of the school.  They are part of a group of New Deal artworks that embellish Lane Tech College Prep High School
  • Langston Terrace Dwellings: Animal Sculptures - Washington DC
    Langston Terrace Dwellings, opened in 1938, was the first U.S. Government-funded public housing project in Washington and the second in the nation.  Initial funding came from the Public Works Administration (PWA); later the U.S. Housing Authority stepped in to complete the job. The International Style complex was designed by African-American architect Hilyard Robinson, a native Washingtonian. It embodies Robinson's belief in the ability of fine buildings and art to inspire and uplift residents. Langston Terrace is well known for its artworks.   Five large animal sculptures by Hugh Collins, Lenore Thomas and Joe Goethe double as climbing structures in the children's playground. The Washington...
  • Langston Terrace Dwellings: Olney Frieze and Sculpture - Washington DC
    Langston Terrace Dwellings, opened in 1938, was the first U.S. Government funded public housing project in Washington and the second in the nation.  Initial funding came from the Public Works Administration (PWA); later the U.S. Housing Authority stepped in to complete the job. The International Style complex was designed by African American architect Hilyard Robinson, a native Washingtonian. It embodies Robinson's belief in the ability of fine buildings and art to inspire and uplift residents. Langston Terrace is enhanced by its artworks. Daniel Olney's terra-cotta frieze, "The Progress of the Negro Race",  lines the central courtyard and chronicles African American history from enslavement...
  • Lankershim Elementary School - North Hollywood CA
    Lankershim Elementary School, which opened in 1910, was rebuilt with funding from the Public Works Administration (PWA) between 1934 and 1935. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation, Board of Education member Arthur Eckman told the Los Angeles Times, “I am sure that every member of the board agrees with me...
  • Lapeer State Home and Training Facility - Lapeer MI
    The Lapeer State Home and Training Facility was used as a house for the mentally feeble and those suffering from epilepsy or other medical conditions. Originally established in 1895, it was previously known as both the Michigan Home and Training School, as well as the Oakdale Regional Center for Developmental Disabilities. Spanning hundreds of acres, it also became known as Oakdale, made up of a number of buildings similar in operations to that of the Lapeer State Home and Training Facility. The Lapeer State Home and Training Facility was created by the state of Michigan to help make advances in...
  • Las Flores Home Education Independent Study Academy - Bellflower CA
    The Works Progress Administration (WPA) reconstructed Las Flores Elementary School (today's Las Flores Home Education Independent Study Academy) in Bellflower, CA, following the 1933 Long Beach earthquake.
  • Laurel Cove Amphitheater - Pineville KY
    "Another distinctive and ambitious project was at Pine Mountain, the site of the annual Mountain Laurel Festival. CCC corpsmen excavated an amphitheater from the hillside and constructed new seats and facilities for the thousands of visitors who made the annual spring pilgrimage to see the governor crown a new queen. More than $500,000 of CCC money went into this park alone." "The Laurel Cove Amphitheater is part of Pine Mountain State Resort Park. This incredible venue has been the home of the Mountain Laurel Coronation for 90 years, the world famous Book of Job drama, spectacular weddings, and the Laurel Cove...
  • Laurel High School: Frank G. Wisner Student Activity Building (Improvements) - Laurel MS
    A Works Progress Administration (WPA) project in the amount of $22,000 was allotted to 2 Laurel schools in 1940. One project was to complete plastering and ceiling, drainage and landscaping of the Frank G. Wisner Activities building for Laurel High School. The building was a two-story Art Moderne designed by N. W. Overstreet and A. H. Town completed 1939-1940.
  • Lava Elementary School Gymnasium (Lava High School Gymnasium) - Lava Springs ID
    Construction on this Public Works Administration (PWA) funded building took place in 1934 as an addition to the town's high school (built in 1911). While retaining the New Deal era gymnasium, the current Lava Elementary School structure replaced the high school in 1979. The Lava School Gymnasium received National Register status in 1997 based on its significance to both local history and architecture. In the application's statement of significance, it was argued that the gymnasium is associated with "the continued development of this small southeastern Idaho town during the Great Depression" and its ability to demonstrate several primary contributions of the...
  • Lawrence-Dumont Stadium (demolished) - Wichita KS
    Lawrence-Dumont Stadium, originally Lawrence Stadium, was a baseball stadium built by the Civil Works Administration (CWA) in 1934. Home to minor league baseball and National Baseball Congress tournament for many years. It was demolished in 2018 to make room for Riverfront Park.
  • Le Grand School - Le Grand CA
    "A modern school at Le Grande, California, constructed with PWA funds."
  • Leland Street Elementary School - San Pedro CA
    Leland Street Elementary School, which opened in 1922, was rebuilt with funding from the Public Works Administration (PWA) between 1934 and 1935. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation, Board of Education member Arthur Eckman told the Los Angeles Times, “I am sure that every member of the board agrees with...
  • Lenicia B. Weemes Elementary School - Los Angeles CA
    Lenicia B. Weemes Elementary School (formerly Thirty-Seventh Street Elementary School), which opened in 1899, was rebuilt with funding from the Public Works Administration (PWA) between 1934 and 1935. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake. One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation, Board of Education member Arthur Eckman told the Los Angeles Times, “I am sure that...
  • Liberia Park Pool and Recreation Center Improvements - Beaumont TX
    Through proceeds of a bond issued in 1925, the City of Beaumont acquired 2.75 acres of land to construct a segregated swimming pool and park for black residents. The modern Bintz pool, 45 x 90 feet, was equipped with dressing rooms, a concourse for spectators, and other accessories supporting residential access. When officially opened in 1927, the park was named “Liberia” after the African Republic. Playgrounds, a softball diamond, a basketball court, a boxing ring, a concrete tennis court, and picnic and handicraft benches were used by approximately 250,000 people annually. The establishment of New Deal programs during the depression supported...
  • Liberty Boulevard Elementary School - South Gate CA
    Liberty Boulevard Elementary School, which opened in 1932, was rebuilt with funding from the Public Works Administration (PWA) between 1934 and 1935. The school appears to have been rebuilt yet again in the 1970s or 80s, although the PWA auditorium may remain—confirmation is needed. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation,...
  • Library (former) - Beemer NE
    The Civil Works Administration (CWA) constructed a one-room library in Beemer, Nebraska. Built with CWA and city funds, the former library was located on Main St., near Highway 8. The structure had "built-in shelves, coat closets, fuel, and closets for surplus magazines."
  • Library (former) - Syracuse NE
    The Civil Works Administration (CWA) constructed the former Syracuse Public Library in Syracuse, NE. The town had applied for Public Works Administration funds for a new library building, but the application was not granted. The town purchased and demolished the Syracuse Congregational Church and the new building that replaced it became the public library. The library held 4,000 volumes in 1934. The government funds for labor and materials amounted to $1,908.75. The building is located at the northwest corner of Plum St. and 6th St.
  • Lillian Street Elementary School - Los Angeles CA
    Lillian Street Elementary School, which opened in 1921, was rebuilt with funding from the Public Works Administration (PWA) between 1934 and 1935. It appears that at least one PWA structure remains on campus—confirmation is needed. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation, Board of Education member Arthur Eckman told the Los...
  • Lincoln City Park - Lincoln KS
    The National Youth Administration (NYA) built park facilities in Lincoln City Park in Lincoln KS. West of the entrance is a bandstand built by the NYA in 1938, and restrooms built by the NYA in 1937.
  • Lincoln Creek Day School (former) - Fort Hall Reservation ID
    In 1933, the Public Works Administration allotted $10,000 (about $203,000 in 2020 dollars) for the construction of three small schools on the Fort Hall Indian Reservation (home of five Shoshone-Bannock Tribes), one of which was the Lincoln Creek Day School. The schools were completed in 1935 and described by Rosalie Springfellow in early 1936: “Three fine school buildings have been erected on the reservation: one at Lincoln Creek, one at Ross Fork and one on Bannock Creek. Compared with the little red schoolhouse of a bygone year, this new school is a palace, with hardwood floors, insulated walls to keep out...
  • Lincoln Elementary School - Long Beach CA
    Designed by Cutter Kirtland, Lincoln Elementary School was built in 1934 with Public Works Administration (PWA) funding. It is one of six LBUSD schools built in the aftermath of the 1933 Long Beach Earthquake that were designed in the Period Revival style instead of WPA/PWA Moderne. The 1933 earthquake destroyed hundreds of schools throughout Southern California. “On August 29, 1933, Long Beach citizens approved a $4,930,000 bond measure for the rebuilding of schools. Applications for approximately thirty-five schools were filed with the Works Progress Administration (WPA) and Public Works Administration (PWA); federal grants up to thirty percent of labor and material...
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 22