- City:
- Wellington, TX
- Site Type:
- Infrastructure and Utilities, Roads, Bridges, and Tunnels
- New Deal Agencies:
- Public Works Funding, Federal Works Agency (FWA)
- Started:
- 1938
- Completed:
- 1939
- Designer:
- Texas Highway Department
- Contractor:
- Purvis & Bertram Construction Co.
- Quality of Information:
- Very Good
- Marked:
- Yes
- Site Survival:
- Extant
Description
Record flooding of the Salt Fork Red River occurred on June 15, 1938, damaging the bridge for then State Highway 52 (now State Highway 203). Deemed unsalvageable by Texas Highway Department Engineers, plans were made for a replacement bridge. The funds for the bridge were jointly allocated by the Texas Highway Department and the Federal Works Agency, each of which committed $80,000.
The new bridge was built seventy-five yards north of the previous bridge. This new location was chosen for its stable red clay and shale bedrock which would help prevent future flood damage. When letting for the contract was concluded, Purvis & Bertram Construction Co. of Ft. Worth, Texas was awarded the construction contract with the winning bid of $126,162.51.
Source notes
Plaque on bridge NRHP Registration FormSite originally submitted by Larry Moore on December 19, 2015.