  • Sanitary Privies - Tallahatchie County MS
    The Works Progress Administration approved a statewide sanitation program for Mississippi in 1935, totaling $390,115.40. The program focused on eliminating typhoid, hookworm and dysentery in 65 of Mississippi’s 82 counties by construction of sanitary toilets (privies) for homes and buildings without access to sewerage disposal. The project was projected to employ 14 workers in each county. The privies were constructed from concrete and wood, costing about $16 in materials for each privy. Property owners were to contribute the materials. Tallahatchie county was allocated $5,956.50. Federal work projects (CWA, FERA, and WPA) for community sanitation and drainage resulted in reductions of both...
  • Arkport Dam and Reservoir - Arkport NY
    Built 1938-39 under the Flood Control Act of 1936, following catastrophic local floods in 1935, and still in use. Federal cost was $1,910,000. C.C.C. built a camp nearby for the construction workers,
  • Gymnasium - Sitka AK
    Peter Kostrometinoff was the supervisor of construction for the new Sitka gymnasium and Ross Gridley was the state Public Works Administration (PWA) inspector engineer for project W1004. The community was awarded a $12,500 grant towards the $27,000 cost approved 10/20/1936. Construction began 2/25/1937 and was completed 9/2/1937 for a total cost of $29,179. Peterman Construction Company of Juneau won the contract for the new gymnasium with a bid of $28,200. The Fairbanks Daily News-Miner reported Sitka also received a loan of $14,850 toward the gymnasium, but that does not appear in the official PWA report. The current status and exact...
  • Water Distribution System - Skagway AK
    Legislative permission was given to issue bonds for supplemental financing of the water distribution system in Skagway in 1934. Skagway was authorized to issue $40,000 bonds to supplement the Public Works Administration project 3961 in the amount of a $29,700 loan and $12,609 grant approved 12/28/1933. Construction began 5/1/1935 and was completed 10/1/1935.
  • Community Center (former) - Belton TX
    The National Youth Administration constructed a community center built of native limestone rock quarried near Belton in 1941. The structure was a rustic design, in Yettie Polk Park, located near the old club house. The work began in summer of 1941. The project, approved by the President in September, was projected to cost $28,000. NYA furnished $22,000 for labor and the local sponsor provided $6,000 for materials, tools and equipment. Excavation for foundation was completed in October and the concrete pouring began in late October. By November, the foundation had been completed, quarrying was in progress at the old limestone...
  • Recreational Building: Naval Reserve Park - Biloxi MS
    The National Youth Administration built a recreational hall at the Naval Reserve Parkin Biloxi in 1938 as W.P. 4380. They also planted rose bushes, cedar trees, and dog wood trees and numerous flower beds along with the construction of the recreation building. The project employed 40 boys.
  • Lincoln Fieldhouse - Milwaukee WI
    In 1939, the Works Progress Administration built the Lincoln fieldhouse in Lincoln Field, Milwaukee WI.
  • Lake Placid Middle High School - Lake Placid NY
    In 1922, due to increasing numbers of students, the Lake Placid school district constructed a large brick high school at the south end of the current middle high school. It was modern and fireproof, sitting on the hill overlooking athletic fields and Main street. In November 1933, again due to increasing numbers of pupils, the community members voted to increase the school size by building two more sections. The original brick building was incorporated as the south end of the newly completed high school, now having three main sections, all finished with a Palladian neoclassical façade. A plaque indicating that...
  • Water Works - Magnolia MS
    Public Works Administration project 5487 was approved 4/4/1934 for water works project in Magnolia. The city received a loan of $10,500 and grant for $3,874 to improve the water works system constructed in 1905. Construction began 7/9/1934 and was completed12/22/1934 for a total of $14,381.
  • Red Banks Drainage District -Marshall and DeSoto Counties MS
    The Reconstruction Finance Corporation provided 22 loans to drainage districts in Mississippi in 1934, totaling $2,726,150. The Red Banks district received $26,000. From the Coldwater River, Byhalia Creek, Red Banks Creek, and a canal 11 miles long ran through the counties of Marshall and Desoto, and into the Pigeon Roost Creek and Pigeon Roost Drainage Canal.