  • Street Improvements - Shelby MS
    PWA Project 1343 for street improvement in Shelby was approved 9/16/1938 for a grant of $20,454. Contracts were awarded 11/30/1938 and construction began 12/5/1938. Work was completed 3/22/1939 for a total cost of $47,638. Mississippi House Bill 23 authorized the town of Shelby to borrow funds to contribute to the PWA funds.
  • Consolidated School - Holly Bluff MS
    Architect Edgar Lucian Malvaney designed the Holly Bluff school building, constructed in 1939 as PWA project 1271. It was approved 7/27/1938 and construction began 10/17/1938. It was completed10/12/1939 for a total cost of $57,305 with PWA funding a grant of $25,515. Bonds were issued in the amount of $25,000 for the remainder. Perry Construction Company built the new school, Paine Heating and Tile Company provided heating and plumbing, and Fatheree Electric Company completed the wiring. The building was dedicated and opened to the public October 7, 1939 and final inspection was made later that month by the architect, school supervisors,...
  • Arizona State University: Irish Hall - Tempe AZ
    In 1940, the Works Program Administration (WPA) constructed the dormitory complex called Irish Hall on the south side of the campus of what was then the Arizona State Normal School, now Arizona State University. Irish Hall consists of three separate wings (A, B & C buildings) around a courtyard. The buildings are plain, two-story Moderne style structures with horizontal streamlining and metal frame windows.  They still function as dormitories (which means that today access is closed to the public). There is a WPA plaque in the entrance way.
  • Neptune Park - Clinton OK
    The Works Progress Administration built the Neptune Park in Clinton, OK. Contributor note: "Neptune Park was constructed by the WPA in 1936. Route 66 was a going concern, and ran right through Clinton. This park is not elaborate, but it served the travelers along adjacent Route 66, with picnic tables and a place to pull off the road and rest. Today, most of the original Route 66 is now Interstate 40, bypassing the town, but in 1936, the park stood in the "Y" between Neptune Drive and Walton Road, right on the Mother Road. We found two WPA picnic tables with native sandstone bases...
  • Wauchula Farmers' State Market - Wauchula FL
    The Works Progress Administration built the Wauchula Farmers' State Market in Wauchula FL, Hardee County. WPA Work Project N0. 1090.
  • Hurricane Shelter - Upper Matecumbe Key FL
    The Works Progress Administration built a hurricane shelter on the island of Upper Matecumbe Key FL.
  • School Athletic Stadium - Clinton OK
    The Works Progress Administration built a school athletic stadium in Clinton, OK. Contributor note: "The original WPA school was razed due to deterioration. This field was originally given to the town for use as a Little League field in the 1980's, however today, the remaining stone wall encircles a playground area at Nance Elementary School. The wall and bleachers appear to be in fairly good shape. The roughly laid native sandstone wall is stepped with a concrete cap, and encircles a two-block area between Hayes and Court. The west end along S. 13th Street is curved. On the north and south sides of...
  • Boswell Regional Center: Mississippi State Tuberculosis Sanatorium - Magee MS
    In a state-wide program to renovate and improve Mississippi institutions, the State Tuberculosis Hospital, using relief labor and ERA funding, carried out extensive painting and repairs and improvements in 1934-1935. $23,844.80 was expended on interior, exterior painting, floor refinishing, plastering, and new construction. Buildings improved included the two infirmary buildings, six smaller buildings including convalescent wards, nurses home, doctors apartments, staff residences, Preventorium, and service building. The carpenter shop, dairy barn, laying houses, and brooder were constructed. The Preventorium and some residences are still extant, but most other buildings have been demolished. The remaining buildings are used as the Boswell...
  • High School - Hazlehurst MS
    The former Hazlehurst grammar school was PWA project W1077. The project was approved 9/25/1935 and completed 11/10/1936 for a total cost of $50,004. PWA supplied a $27,500 loan and a $22,457 grant. The school was enlarged in 1947, and currently serves as the high school. Work on clearing the lot began January 1936. Contractor was J. R. Flint and architect was E. L. Malvaney.
  • Bayou Auguste Homes Public Housing - Biloxi MS
    Bayou Auguste Homes for African Americans was completed 1941 in the 600 block of Roy Street. John Thomas Collins was supervising architect and construction was by Pittman Brothers.