  • Harrison Experimental Forest - Saucier MS
    The camp for Harrison Experimental Forest research was constructed between 1935-1938 in Harrison County. The forestry research complex contained Rustic Style dwellings and offices, including laboratories, two residences--one of which was designed by New Orleans architect Gerhardt Kramer in 1938, cone shed, two garages, equipment shop, machine shop, and warehouse. The cone shed was destroyed by Hurricane Katrina in 2005, but the remaining buildings are extant and in use. There were two Civilian Conservation Corps camps in the Saucier vicinity. Camps F-10 and F-12 provided the labor for construction, building of roads and bridges to the research complex, and participated...
  • Camp Pratt - Columbus MS
    The City of Columbus was awarded $8,821 for WPA project 41048 for improvements to Camp Pratt recreation center. The summer camp facility constructed a swimming pool, keeper's house, and remodeled camp houses, using 27 workers for 6 months. The city of Columbus supplied the materials. The 70-acre site was sold in 2018 with the agreement the city could continue to use it for summer camp.
  • National Mall: Tennis Courts (former) - Washington DC
    The New Deal carried out a major renovation of the National Mall, the green centerpiece of Washington DC.  Funding was provided by the Public Works Administration (PWA), labor power by the Works Progress Administration (WPA) and supervision of the work was the responsibility of the Superintendent of the National Capital Parks, which had become a branch of the National Park Service when the park system was taken over by the Interior Department in 1933.  One element of the National Mall project was the building of tennis courts on the north and south sides of the Mall between 3d and 4th streets.  It...
  • Jefferson Davis County Courthouse Improvements - Prentiss MS
    WPA project 41146 approved $19,859 for "new construction, enlargement, alteration, and improvement of the building, including addition of paintings, installing of plumbing and electric facilities and other operating equipments and appurtenances to perform incidental and appurtenant work" (Half Million, 1940, p. 15). Smith and Norwood were selected to construct a "complete modernization program of the Jeff Davis county courthouse"(To Remodel, 1940, p. 6) with construction beginning May 1940.
  • School Complex - Leakesville MS
    PWA w1104 funded the addition of a five-room building for high school classes and a new gymnasium on the Leakesville school complex. The award for loan of $12,500 and grant of $10,396 was approved 9/25/1935. Construction began 1/6/1936 and was completed 10/12/1936 for a total cost of $28,841. The classroom building was constructed by Oden and Glen for the sum of $11,441 and the remainder funded the gymnasium. The gymnasium also served as a community center in addition to athletic events. The new classroom building was added to the east end of the complex and the gymnasium to the west...
  • Grammar School - Fulton MS
    The Fulton Grammar School was completed in 1940 with a WPA grant, following the loss of the old grammar school by fire in April. The one story brick school was designed by architect J. B. Lawson. Containing 19 rooms, the school housed a library, music room, kindergarten, office, and a 550-seat auditorium. WPA provided funds between $48,008-$74,590. The school closed in 1999, was named a Mississippi Landmark in 2001 and received grant money in the amount of $168,000 from the Mississippi Arts Commission and $75,000 from the Community Heritage Preservation foundation for renovations. It is currently in used by the...
  • Bedford Dwellings - Pittsburgh PA
    Bedford Dwellings was the first of Pittsburgh Housing Authority’s construction of low-cost housing. Dr. B. J. Hovde, the administrator, announced the contract would be awarded to Ring Construction Company with the low bid for the 420 units at $1,173,000. The completed project was proposed to cost $2,560,000 and cover a 20-acre site on Bedford Avenue. Low bidders on plumbing work was Moss and Blakely, heating was George H. Soffel and Company, and electrical was Sargent Engineering Company. Lumber and millwork was awarded to Atlas Lumber and Supply Company. Bedford Dwellings were ready for occupancy March 1, 1940 and able to...
  • Village Terrace Housing - Pittsburgh PA
    Architects Raymond Marlier, Edward B. Lee, William Boyd, and Bernard Prack designed the 3 public housing units constructed 1938-1940 in the Hill District. The USHA loaned 90% of the cost of the 3 projects. Terrace Village No. 1 was the second project for Pittsburgh, housing 805 families with an estimated cost of $4,950,000. The proposed project required the removal of 800,000 cubic yards of dirt from a hill overlooking a gully. No. 1 was constructed on Ruch Hill, covering 40 acres. No. 2 was built of Goat and Gazzam Hills, covered 89 acres, housed 1,818 families and cost approximately $10,800,000....
  • Clay Street School Repairs and Alterations - Vicksburg MS
    Public Works Administration project 1337 provided repairs and alterations to both Clay Street School and Carr High School in 1939, along with construction of two new school buildings.
  • Central High School Auditorium and Gymnasium - Vicksburg MS
    The addition of an auditorium and gymnasium, since demolished, was completed for the 1924 Central High School building, along with improvements to the athletic field and athletic building. Architects N. W. Overstreet and A. H. Town designed the additions in 1936. Public Works Administration project 1148 was approved 7/21/1936 for $34,363 grant. Construction began 12/21/1936 and was completed 11/18/1937 for a total cost of $78,366.