• Brewer Municipal Auditorium - Brewer ME
    The Brewer Municipal Auditorium in Brewer ME was built with the support of the Federal Works Agency of the Public Works Administration in 1939. "Prior to the beginning of the 1939 municipal year all arrangements for building the auditorium had been made and ground at the site actually broken. This work was suspended during the winter months, but resumed as early in the spring as practicable and carried through to completion November 8, 1939. The building was built under the program of the Federal Works Agency of the Public Works Administration whereby financial assistance to the extent of 45 per cent of...
  • Clifton School (demolished) - Clifton TX
    The Clifton School is an Art Deco style building constructed in 1940. The structure is brick with pre-cast white stone ornamentation (made on the job site). The entrance has two stories, the second story being reserved for administrative space. Two one-story wings extend from the entrance. The school had a total of 32 rooms (eighteen of which were classrooms) and had wood floors. The interior cafeteria food service was part of the WPA lunch project. The school was demolished in 2019.
  • Eden Grammar School - Eden TX
    The Works Progress Administration (WPA) built the Eden Grammar School in Eden, Concho County. The one-story building is a combination of brick and rock. The WPA plaque bears the date 1938-1940. The cornerstone above mentions the date 1941. A high school building next to the elementary school, and a rock wall around the schools, are unmarked.
  • Fair Park - Dallas TX
    Fair Park was expanded by New Deal agencies WPA, CCC, and PWA in 1936. The Dallas City Commission is considering to privatize Fair Park in 2018.
  • Oakes Field House (former Recreation Building) - South Charleston WV
    The Public Works Administration funded the construction of the Oakes Field House (former Recreation Building) in South Charleston in 1939. The Recreation Building, as it was called in 1939, is a two-story brick building with gable and seven bays facing 3rd street. The central three bays have arched doorways evocative of Palladian windows. The building is about 72 feet wide and 115 feet long with a small one-story raised brick structure extending towards the Oakes Field. An addition (possibly original, date is unknown) of approximately 12 x 22 feet is on the northwest corner. There are ten large two-story windows running along the...
  • Olfen Public School - Olfen TX
    A new $17,800 school building at Olfen, Runnels county, was dedicated 3/26/39. The modern six- room structure was completed March 22. Attending the dedication was E. C. Grindstaff, county school superintendent; John C. Becker, architect who designed the building; the Rev. O. A. Boockman, Catholic priest at Olfen; Hugh Horn, of the Abilene Construction company, general contractors, and Glenn A. Rector, PWA engineer and inspector. The building was made possible by a 55 per cent PWA grant.
  • Penelope Rural High School, Dist. 8 - Penelope TX
    The Works Progress Administration built the Penelope Rural High School, School Dist. 8. The one-story brick building bearing white cement decorations at the top was completed in 1940. It houses eight classrooms, a gym-auditorium, offices, storerooms, and a locker room.
  • School Improvements - Rising Star TX
    The Works Progress Administration conducted improvement work at the Rising Star School in Rising Star, Texas, in 1939. According to the Abilene Reporter-News, "Rising Star School Gets WPA Allotment RISING STAR, April 12.-- Announcement was received here today that $18,933 had been allotted by works progress administration to the Rising Star Independent school district. The allotment makes possible a project planned by school board members 18 months ago, the cost of which aggregates $25,000. Included In the project will be a new home economics building, a rock veneer for the gymnasium, a deep well for the school's, water supply, a rock fence for the...
  • Seagle Building - Gainesville FL
    A Gainesville FL landmark building that began construction in 1926 but was unfinished until New Deal agency (PWA and WPA) funding made completion possible. It was used by University of Florida following completion in 1937 and later was converted into residential units above office.
  • Wagner Performing Arts Center - Monroe WA
    The Wagner Performing Arts Center in Monroe, Washington was originally the auditorium of Monroe Junior High School, built in the late 1930s with the help of PWA grant funds. Construction of the auditorium and school began in September, 1938 and was completed within a year. The dedication ceremony was held September 15, 1939. Governor Clarence D. Martin was the keynote speaker, and declared the building to be one of the finest of its kind in the state. PWA representative Francis Grant was in attendance, as well as architect William Mallis of Seattle, Mr. Tait of the Tait Engineering Company of Everett, and...