• 10th Street and Autumn Lane Culvert - Harrah OK
    The Works Progress Administration built a culvert at the intersection of 10thStreet and and Autumn Lane in Harrah, in 1939. Contributor note: "This culvert carries water run-off north-south under 10th Street, about two miles west of the town of Harrah. The culvert opening is about 3 ft by 3 ft. Stamped on top of the curbing on either side of the road is the WPA shield and the date 1939."
  • 10th Street and Dobbs Road Culverts - Harrah OK
    The Works Progress Administration built culverts at the intersection of 10th Street and Dobbs Road in Harrah, in 1939. Contributor note: "These two culverts carry water run-off east-west under Dobbs Road, on each side of 10th Street. The culverts were built by the WPA in 1939. The culvert on the north side of 10th Street is approximately 2 ft. high and 3 ft. wide; the culvert on the south is 2 ft. high and 4 ft. wide. Though partially filled with sand and dirt, they appear to be handling the water flow satisfactorily. On the curbing of each culvert end, a WPA stamp...
  • 10th Street and Luther Road Culvert - Harrah OK
    The Works Progress Administration built a culvert at the intersection of 10th Street and Luther Road in Harrah, in 1939. Contributor note: "This culvert carries water east-west under Luther Road, on the south side of 10th Street. The culvert opening is approximately 3 ft by 3 ft. The culvert carries water run-off and we saw no creek in the vicinity. On top of the curbing, the WPA stamp reads 1939."
  • 10th Street and Peebly Road Culverts - Harrah OK
    The Works Progress Administration built a culvert on 10thStreet Peebly Road, Oklahoma County. Contributor note: "On 10th Street, between Choctaw and Harrah, at Peebly Road, there are two culverts which carry water east-west from the drainage ditches alongside 10th Street. The culvert openings are rectangular, and approximately 2 ft. by 3 ft. The WPA did extensive road and drainage work in this area in the latter part of the 1930's. These culverts are stamped 1939."
  • Reno Avenue Culvert - Harrah OK
    The Works Progress Administration built a culvert on Reno Ave in Harrah, in 1941. Contributor note: "This culvert handles water run-off frm the drainage ditch on the north side of Reno Avenue. The water runs through the culvert north-south under Reno Avenue. The opening in this culvert is approximately 2 ft. high by 6 ft. wide. Unlike most culverts in this area which were built in 1939, this culvert was constructed in 1941."    
  • School Gymnasium - Harrah OK
    "The Harrah school gym is unique because it is constructed of poured concrete. This is a two-story gym building with a barrel roof. The building is painted white and the windows have been covered with metal siding painted blue. Only a couple of window units have a small window remaining. "The building was constructed in 1939-1940 with a WPA appropriation of $84,078. A brick extension has been added to the gym on both the east and west sides. The building appears to still be in use."