Search Results for: demolished
-
School Improvements (demolished) – Skowhegan ME
The Independent Reporter often covered the ongoing work of the New Deal at providing relief for the unemployed on work in Skowhegan. In 1933-1934, the CWA and then FERA carried out extensive improvements to the local junior and senior high… read more
-
Election Department Building (demolished) Repairs – Boston MA
A Boston Public Works Department report cited Federal Emergency Relief Administration (F.E.R.A.) labor as conducting the following work: “The Election Department building, at the corner of Broadway and Dorchester avenue, was repaired.” The building is no longer extant.
-
Broadway Bridge (demolished) Repairs – Boston MA
A Boston Public Works Department report cited Federal Emergency Relief Administration (F.E.R.A.) labor as conducting the following work: “Broadway Bridge was chipped, cleaned and painted.” Spanning Fort Point Channel, the bridge has since been demolished as the area has been… read more
-
Warren Bridge (demolished) Repairs – Boston MA
A Boston Public Works Department report cited Federal Emergency Relief Administration (F.E.R.A.) labor as conducting the following work: “Warren and Charlestown Bridges, repairs to fender piers.” Warren Bridge was demolished in 1962.
-
High School (demolished) – Auburn MA
The former high school in Auburn, Massachusetts was constructed with the assistance of federal Public Works Administration (PWA) funds. “For the past two decades, the increasing cost of tuition and transportation of pupils to Worcester caused agitation for an Auburn… read more
-
Fire Drill Tower (demolished) – Fitchburg MA
Works Progress Administration (W.P.A.) laborers constructed a fire drill practicing tower in Fitchburg, Mass. The drill tower was located at 28 Oliver St in Fitchburg. It was built behind an already existing fire station. The drill tower along with the… read more
-
Utah State University Eastern: Administration Building (demolished) – Price UT
The PWA built the three original buildings of Carbon Junior College, now Utah State University Eastern, from 1937-38. In 2015, the last of these original buildings was demolished. From “A Look Back at the Old SAC”: “Carbon College, created as… read more
-
Fire Station (demolished) Restoration – Carrizo Springs TX
Construction through the Works Progress Administration (WPA) began in 1935 with 18″ stone quarried from a nearby ranch and was completed in 1937. This building housed the Volunteer Fire Department downstairs and City Hall upstairs until the 1970’s. As of… read more
-
Roosevelt School (demolished) Improvements – Framingham MA
All 17 schoolhouses in Framingham, Massachusetts were painted, remodeled, and/or repaired with federally funded labor during the Great Depression. The former Roosevelt School, demolished in the 1950s, was located at the southeast corner of Fay Rd. and Seminole Ave., now… read more
-
Cushman School (demolished) Improvements – Boston MA
Works Progress Administration (W.P.A.) labor conducted improvements at the since-demolished Cushman School in Boston, Massachusetts. The facility was located at 44 Prince St. WPA Bulletin: To insure the safety of pupils in the Cushman School, North End, WPA has rebuilt… read more