• Back Bay Fire Co. No. 4 Station - Biloxi MS
    Works Progress Administration (WPA) project No. 3544 started 10/05/1935 included 3 additional fire stations. WPA funding supplied $13,495.01 and the sponsor $9,513.78 for payroll, materials, and equipment. Ground was broken for the new Back Bay fire station on the north side of Elder Street between Lameuse and Reynoir Street. The Back Bay station was expected to take 90 days and cost about $5,000. It contained a one engine garage, bed room, bath, kitchen and breakfast room, with a 20 by 30 foot assembly room. The brick and concrete block building was designed in Colonial Style by architect John T. Collins....
  • Central Fire Station - Biloxi MS
    Works Progress Administration (WPA) project No. 3544 started 10/05/1935 included 3 additional fire stations. WPA funding supplied $13,495.01 and the sponsor $9,513.78 for payroll, materials, and equipment. Hook & Ladder, adjacent to L & N Depot, on Main Street. The Central Fire Station construction was begun 04/20/1937 with an expected cost of about $10,000. The formal opening of the new fire station was July 1 when the old Hook and Ladder Company hall was vacated with the final departure of a parade of equipment and personnel to the new station on Main Street. The new station was 46 x 71 feet,...