• Hollandale-Yerger (Darlove) Road - Washington County MS
    Public Works Administration project 1307 for completion of gravel roads, bridges, and drainage was approved for Washington County 2/21/1934. A loan in the amount of $400,000 and a grant for $161,149 funded construction of 8.503 miles of the road between Hollandale and Yerger (now named Darlove), as well as between Murphy and Slater's Ferry, and between Winterville and Priscilla. George Vizant was chief engineer of the Washington County Highway Commission, and Barber Brothers of Baton Rouge, LA were contractors. Construction began October 17, 1934 and was completed by August 31, 1937.
  • Murphy-Slater Ferry Highway - Washington County MS
    Public Works Administration project 1307 was awarded to Washington County following approval 2/21/1934. A loan in the amount of $400,000 and a grant of $161,149 enabled the construction a number of gravel roads throughout the county. Bids were advertised in September 1934 for construction of grading, drainage structures and bridges and gravel surfacing on 11.548 miles of the Murphy-Slater Ferry Highway. The highway began in Murphy and ended at the Slater Ferry Crossing for the Sunflower River. George Vinzant was chief engineer of the Washington County Highway Commission. Contractor was Barber Brothers of Baton Rouge, La. Construction began 10/17/1934 and...