Main Street Steps – Superior AZ
Date added: August 1, 2020; Modified: April 7, 2022
The Works Progress Administration (WPA) built steps and sidewalk on Main Street in Superior AZ. The sidewalk WPA stamps are undated.
Select search criteria in one or more boxes (fields can be left blank), then click on SEARCH button at bottom of the page. To reduce scrolling through long lists, begin typing a name (e.g., ’Smith’ under artist, “Juneau” under state and city).
Hide Search OptionsDate added: August 1, 2020; Modified: April 7, 2022
The Works Progress Administration (WPA) built steps and sidewalk on Main Street in Superior AZ. The sidewalk WPA stamps are undated.
Date added: August 11, 2012; Modified: February 8, 2015
“The Boyce Thompson Arboretum was established in 1923. Franklin Crider, a University of Arizona botanist, managed the research unit to study soil retention by plant roots. In 1933 a small group of Civilian Conservation Corps enrollees from camp F16A at… read more