Municipal Improvements – Poolesville MD
Date added: June 16, 2013
The WPA constructed a reservoir for a fire protection pump shed and installed a pipe connecting the pump and reservoir. Current status and exact location of the project unknown.
Select search criteria in one or more boxes (fields can be left blank), then click on SEARCH button at bottom of the page. To reduce scrolling through long lists, begin typing a name (e.g., ’Smith’ under artist, “Juneau” under state and city).
Hide Search OptionsDate added: June 16, 2013
The WPA constructed a reservoir for a fire protection pump shed and installed a pipe connecting the pump and reservoir. Current status and exact location of the project unknown.