Select search criteria in one or more boxes (fields can be left blank), then click on SEARCH button at bottom of the page. To reduce scrolling through long lists, begin typing a name (e.g., ’Smith’ under artist, “Juneau” under state and city).

Hide Search Options

Displaying 1-15 of 18 results

    Flood Control Dike – Holyoke MA

    Date added: January 28, 2017; Modified: February 13, 2018

    In response to heavy flooding after a severe storm in 1936, Works Progress Administration (W.P.A.) labor—under the direction of U.S. Army engineers—constructed dikes along the Connecticut River in many Massachusetts communities, including Holyoke. The exact status and locations of these… read more

    Armory (former) Improvements – Holyoke MA

    Date added: February 13, 2018

    The Works Progress Administration (WPA) conducted improvement work at the historic armory building in Holyoke, Mass. WPA project details: “Improve interiors of building and construct retaining wall” Official Project Number: 165‐14‐2516 Total project cost: $16,057.00 Sponsor: Commonwealth of Massachusetts, Military Department… read more

    ECOS Environmental Center – Springfield MA

    Date added: May 6, 2017

    Now the ECOS Environmental Center, this facility by Porter Lake in Forest Park was constructed as a field house by the Works Progress Administration (W.P.A.) in 1936-7. It was known as the “Warming House” and was used for skating until… read more

    Anniversary Park – Holyoke MA

    Date added: January 20, 2017; Modified: May 6, 2017

    Works Progress Administration (W.P.A.) laborers worked at Anniversary Park in Holyoke, Mass. Work included the construction of a recreation center and winter sports facilities.

    Post Office, Holyoke, MA

    Post Office – Holyoke MA

    Date added: January 28, 2013; Modified: April 11, 2017

    Constructed by the Treasury Department in 1934. This is an elaborate building with a large amount of marble on the interior, art deco moulding, a bas relief eagle above the door, and reliefs in the wall on the front highlighting… read more

    Sidewalks – Holyoke MA

    Date added: February 19, 2017

    Works Progress Administration (W.P.A.) labor constructed sidewalks on Northampton St. and other streets in Holyoke, Mass.

    Dickinson Paper Mill Demolition – Holyoke MA

    Date added: January 23, 2017; Modified: January 23, 2017

    Works Progress Administration (W.P.A.) laborers demolished the former Dickinson paper mill on behalf of the city of Holyoke, Mass. WPA Bulletin: The Dickenson [sic] Paper Mill property, idle for the last nine years, has been purchased by the city and… read more

    McLean Reservoir Road – Holyoke MA

    Date added: January 16, 2017

    Works Progress Administration (W.P.A.) conducted the improvement work around McLean Reservoir in Holyoke, Massachusetts. WPA Bulletin: At High McLean Reservoir, Holyoke, WPA is improving the travel-way. Work includes widening and eliminating curves, extending culverts, grading gutters for surface drainage and… read more

    Whiting Reservoir Road – Holyoke MA

    Date added: January 11, 2017

    Works Progress Administration (W.P.A.) workers rebuilt the road around Whiting Reservoir in Holyoke, Massachusetts. From a W.P.A. Bulletin: Whiting Reservoir, Holyoke, a rippling splash set in a beautiful green countryside, is bordered by a narrow, dangerously curved road, lacking gutters,… read more

    MacKenzie Field – Holyoke MA

    Date added: May 20, 2016; Modified: May 20, 2016

    Mackenzie Field is located in Holyoke, Massachusetts, next to Holyoke High School. In 1938, the concrete bleachers on the 1st base side of the field are a WPA project done at a cost of $35,392.

    Mount Tom State Reservation – Holyoke MA

    Date added: July 21, 2015

    According to the Wikipedia page for Mount Tom, “In 1933 the Civilian Conservation Corps assisted with the construction of reservation structures and park roads; their work also remains visible today.”