Select search criteria in one or more boxes (fields can be left blank), then click on SEARCH button at bottom of the page. To reduce scrolling through long lists, begin typing a name (e.g., ’Smith’ under artist, “Juneau” under state and city).
Hide Search Options
Displaying 4 of 4 results
Date added: April 14, 2015; Modified: October 2, 2021
The Stone Castle (Bristol Municipal Stadium) at Tennessee High School in Bristol, Tennessee was constructed with the assistance of federal Public Works Administration (PWA) funds between 1934 and 1936. Limestome for the stadium was locally quarried for Bristol’s flood control… read more
Date added: April 14, 2015; Modified: October 1, 2021
Bristol, Tennessee’s historic Holston Valley High School building was constructed between 1933 and 1935 with $90,828 of federal funds through the Public Works Administration (PWA). The building is still in service.
Date added: April 14, 2015; Modified: October 1, 2021
Bristol’s Tennessee High School was constructed between 1937 and 1939 with the assistance of federal Public Works Administration (PWA) funds during the Great Depression. The building is an exemplary example of Colonial Revival school architecture.
Date added: June 23, 2016; Modified: April 11, 2017
Construction for Watauga State Park began in 1939 with the CCC arrival to survey, clear land, and begin dam construction and other facilities (Van West, 2001). Kingsport Times (Sept. 18, 1939) indicated the name Watauga was rejected due to so… read more