• London Locks and Dam - London WV
    The Public Works Administration funded construction work at the London Locks and Dam on the Kanawha River, approximately 25 miles south of Charleston. The project was authorized through the River and Harbor Act of 3 July 1930. The Cost of construction was $3,269,800. The locks became operative in September 1933 and were completed in May 1934. The locks contain two parallel lock chambers. The project is currently operated by the Army Corps of Engineers.