• Inspection Station Alterations - East Richford VT
    The historic U.S. Border Inspection Station on State Route 105A in East Richford, Vermont was altered in 1940 with U.S. Treasury Department funds. Modifications included changes to "the garage and inspection bays and residential quarters."
  • Missisquoi River Dam - Richford VT
    The Public Works Administration (PWA) funded the construction of a dam on the Missisquoi River in Richford VT. Docket No. 827-Vt. The PWA supplied a $59,000 loan and $22,823 grant for the project, whose total cost was $87,177. Construction occurred between Oct. 1933 and Oct. 1935. The exact location and the status of this dam are unknown to the Living New Deal.