Ledyard Bridge (replaced) - Norwich VT to Hanover NH The second of the (now) three bridges to be designated Ledyard Bridge spanning the Connecticut River between Norwich, Vermont and Hanover, New Hampshire was financed in part by the federal Public Works Administration (PWA) during the Great Depression. The PWA supplied a grant of $8,697 for the project, whose total cost was $31,095 (according to a PWA document; other sources put it at $148,678; Living New Deal is unclear as to the discrepancy). Construction occurred between Oct. 1934 and Oct. 1935. The bridge was replaced in 1998.
PWA Docket No. 9088-Vt.