• Kamas Grade School Improvements - Kamas UT
    The Public Works Administration funded repair work for the 1904 Kamas Grade School in Kamas, Smith Summit School District; Docket # 1023-R (Utah). The architect of record was Ashton and Evans, and the contractor was Berntson and Kuhre.  
  • Kamas High School (demolished) - Kamas UT
    The Public Works Administration funded an expansion of the Kamas High School in Kamas, Smith Summit School District. Docket # 1023-R (Utah). The architect of record was Ashton and Evans, and the contractor was Berntson and Kuhre. "The Gym & Mech Arts building cost $104,000 and was done in conjunction with the Woodland El and Kamas El school alterations and repair for a total cost of $120,000."
  • Soapstone CCC Camp - Kamas UT
    The CCC operated camp F-6 on Soapstone Creek near Kamas. The site appears to have served as YMCA Camp Roger since 1948, though the extent to which CCC traces remain is unknown. Based on the link to the "Camp Roger, Then and Now" photograph, the YMCA appears to have occupied already extant cabins in 1948; if these were CCC structures it would suggest they are still in use.