• WPA Sidewalks - West Sayville NY
    During 1935 WPA labor was responsible for the laying of sidewalks “on the west side of Cherry avenue from street, to the end of the present walks, north of Union street,” in in West Sayville, N.Y.  In 1936 the WPA undertook a similar project one block over, "on the west side of Tyler avenue, extending north from Union street to the alley connecting Tyler and Cherry avenues and also along the north side of this short alley."  Further WPA sidewalks were built one block west, on Division Avenue. ** Articles in this newspaper differ with respect to this detail, but...