• Newlands Project Improvements, CCC Camp Carson River - Fallon NV
    “The Newlands Project (originally the Carson Truckee Project) is considered Nevada’s greatest reclamation project. The Truckee-Carson Irrigation District has operated the irrigation system since 1926. By the 1930s, the Newlands Project needed to be enlarged and overhauled if Fallon Farmers were to stay in business. The bureau was also concerned with the efficiency of irrigation systems in the Pershing County Water Conservation District in Lovelock, the Washoe County Water Conservation District in Reno, and the Walker River Irrigation District in Yerington. By 1935, five Bureau of Reclamation CCC camps had been established to store water and enlarge and upgrade existing irrigation...
  • Newlands Reclamation Project Improvements - CCC Camp Newlands - Fallon NV
    “The Newlands Project (originally the Carson Truckee Project) is considered Nevada’s greatest reclamation project. The Truckee-Carson Irrigation District has operated the irrigation system since 1926. By the 1930s, the Newlands Project needed to be enlarged and overhauled if Fallon Farmers were to stay in business. The bureau was also concerned with the efficiency of irrigation systems in the Pershing County Water Conservation District in Lovelock, the Washoe County Water Conservation District in Reno, and the Walker River Irrigation District in Yerington. By 1935, five Bureau of Reclamation CCC camps had been established to store water and enlarge and upgrade existing...
  • Water System - Fallon NV
    A waterworks construction project in Fallon, Nevada was undertaken during the Great Depression with the aid of federal Public Works Administration (PWA) funds. The PWA supplied a $76,000 loan and $24,063 grant for the project, whose total cost was $118,091. Work occurred between August 1934 and January 1936. (PWA Docket No. NV 2010)