• Sanitary Sewers - Steele ND
    A sanitary sewer construction project in Steele, North Dakota was undertaken during the Great Depression with the aid of federal Public Works Administration (PWA) funds. The PWA supplied a $9,975 grant for the project, whose total cost was $22,676. Work occurred between October and December 1936. (PWA Docket No. ND W1017)
  • Water System - Steele ND
    A waterworks construction project in Steele, North Dakota was undertaken during the Great Depression with the aid of federal Public Works Administration (PWA) funds. The PWA supplied a $27,000 loan and $22,341 grant for the project, whose total cost was $50,026. Work occurred between December 1935 and June 1936. (PWA Docket No. ND W1018)