• Quimby Field - Gardiner ME
    "The Quimby Athletic Field of Gardiner was enlarged to make a combination baseball and football field at a cost of $17,257.08 of which $1,368.50 was spent for material. There were 11,700 cubic yards of earth moved and 300 cubic yards of ledge had to be taken out. All was done by hand. Two grandstands 50 feet long were constructed from lumber salvaged at the Veteran's Administration Grounds at Togus. They were roofed with metal roofing, painted with a heavy coat of asphalt aluminum paint. These stands will seat 300 people each. A dressing room was built beneath one and a lavatory and...
  • Rolling Brook Dam Bridge - Gardiner ME
    Lower Rolling Dam bridge is a 29 foot concrete T-beam over the Rolling Dam Stream. It was one of 26 bridges that were badly damaged or destroyed by a 500 year flood in March 1936. A 1936 Annual Report by the Maine Highway Commission notes that the reconstruction of these bridges were U.S. Works Program Flood Relief projects and were handled under the jurisdiction of the Bureau of Public Roads, U.S. Department of Agriculture. Labor was provided to some by the Works Progress Administration. At some point in the past, the bridge was abandoned when Route 24 was changed and...