• Waterworks - Paxton MA
    A waterworks construction project in Paxton, Mass. was undertaken with the assistance of federal Public Works Administration (PWA) funds. The P.W.A. supplied a $70,000 loan and a $26,000 grant for the project, whose total cost was $90,540. Construction occurred between July 1934 and June 1935. PWA Docket No. MA 1164