  • School Repairs - Searsport ME
    According to town reports, needed repairs were conducted on the former school system of Searsport by CWA, FERA, & WPA. Of the school houses mentioned, only one on Mt. Ephraim St. survives as an apartment building. 1933 "There were three projects of grading school grounds entered under the C. W. A. which the Selectmen have engineered. This work will certainly improve the looks of the buildings and also make it possible for the children to play on the school grounds, instead of in the street. Much credit is due the Selectmen for the interest that they have shown in these projects. The...
  • Central Maine Sanitorium (abandoned) - Fairfield ME
    According to Town Reports, works was performed at the CMS by the New Deal. 1933 The following is a list of the various projects which have been carried on during the past three months through the use of C.W.A. Funds. No.1 Rebuilding of 2,500 feet of road from State Highway to Central Maine Sanatorium; work includes rock base with gravel top, also culverts and guard rail fence. No. 13 Excavating under the cellars of three buildings at Central Maine Sanatorium. 1934 Report of Relief Work During the past year, through the use of C.W.A. And E.R.A. Funds, the following projects have been carried on: 9. Excavating under three...
  • School - Rose Hill MS
    The Rose Hill school was project W1230, approved 8/12/1937 for $7,940. The school was completed 4/29/1938 for a total cost of $17,923. The first contract was awarded 11/20/1937 and construction began 12/7/1937. Architects were Krouse & Brasfield and Builder/Contractor was Currie & Corley.
  • Courthouse Jail (demolished) - Bay Springs MS
    Public Works Administration, project W1208, constructed a two-story Art Deco style jail for the courthouse. A grant of $13,939 was approved toward the total cost of $30,977 6/22/1938. Contract was awarded 9/13/1938 and construction begun 9/22/1938. Architects were Krouse & Brasfield and builder was Currie & Corley. Construction was completed 1/19/1939. The jail and courthouse were destroyed in 1975.
  • Mississippi State University: Veterinary Science Building - Starkville MS
    The Art Moderne Veterinary Science building was one of the buildings constructed 1937 as part of the 5-year building program for Mississippi State College, 1934-1939. Projects w1209, w1226-1 and w1226-2 constructed buildings on the campus of then Mississippi State College (now Mississippi State University). The projects were part of a 5-year building program totaling $1,424,478. The architect was Stevens & Johnston and contractor was J. R. Flint Construction Company.
  • Mississippi State University: Swimming Pool and Poolhouse (demolished) - Starkville MS
    Mississippi State College constructed a number of buildings and structures, and made renovations and repairs to existing buildings from 1934-1939 totaling $1,424,478. The projects were w1209, w1226-1 and w1226-2 from PWA. The swimming pool and poolhouse were completed in 1935, and demolished around 2005. Architect Harry W. Stevens completed the design.
  • Mason Dixon Line Historical Marker - Marshall County WV
    One of many county line historical markers placed in West Virginia at the Wetzel/Marshall County Line. The West Virginia historical marker program began in 1934 with the beginning research for the markers with the intention of placing markers around the state to encourage tourism. Dr. Roy Bird Cook, a Charleston druggist, a longtime commission member, and a vocational historian worked on the project. Approximately 5,000 sites were collected with 440 markers selected by the commission for placement. Most of these along 44 state and federal highways. The funds came from the Federal Emergency Relief Administration and the Works Progress Administration. In addition to...
  • CCC Camp F-5 (Granite Flat Campground) - Mount Timpanogos UT
    The Civilian Conservation Corps (CCC) established Camp F-5 in Timpanogos Cave National Monument in the summer of 1933. Company 940 was sent there from training at Fort Douglas, with its 200-man contingent including both young enrollees and a large complement of "experienced men" from Salt Lake City. During summer 1933 and through the winter of 1933-34 (Baldridge, p. 164), the CCC made many improvements to the national monument. Baldridge (p. 33) states that:  "..much was accomplished, as the men built roads, bridge, and trails; poisoned rodents; construct picnic tables for many campsites; and constructed Forest Service facilities, including the South Fork Ranger...
  • Atlantic Hose House (abandoned) - Augusta ME
    According to the auditors report in the 1934 town report, the CWA was involved in reconstruction of the fire station known as the Atlantic Hose House. According to a 2016 city report, the building is currently in a severe case of decay. For a time it was used by the Cony High School athletic department across the street for storage and activities but has been empty for several years, and boarded up. The city recommends that it be razed due to its condition.
  • North Carolina State University: Riddick Stadium (demolished) Improvements - Raleigh NC
    In 1933, North Carolina State College developed plans for new concrete stands to seat about 16,000 spectators at the existing Riddick Stadium on campus. That same year funding from the Reconstruction Finance Corporation allowed construction of several sections of concrete stands on the east side of the stadium. In 1934, funding from the Public Works Administration (PWA) allowed construction of the final section of the east stands. In 1935, additional PWA funding resulted in construction of all sections of concrete stands on the west side of stadium. The original plans called for concrete stands on the south side to connect...