  • School Gymnasium - Harrah OK
    "The Harrah school gym is unique because it is constructed of poured concrete. This is a two-story gym building with a barrel roof. The building is painted white and the windows have been covered with metal siding painted blue. Only a couple of window units have a small window remaining. "The building was constructed in 1939-1940 with a WPA appropriation of $84,078. A brick extension has been added to the gym on both the east and west sides. The building appears to still be in use."
  • Pier Bridge - Santa Monica CA
    In 1939, the Federal Emergency Administration of Public Works, i.e., the Public Works Administration (PWA), funded the construction of a bridge connecting Ocean and Colorado Avenues with the famous Santa Monica Pier in Santa Monica, CA. "The bridge was constructed to alleviate traffic congestion that occurred as a result of economic development of the City, the local building boom and subsequent local population boom, and the ongoing popularity of the attractions on the Pier" (see Santa Monica Pier Bridge Replacement Project, pp. 2.7-15, 16). The Pier Bridge is a simple reinforced concrete roadway, supported by multiple pediments, spanning the Pacific Coast Highway...
  • Post Office (former) - Riverton NJ
    The historic former post office building in Riverton, New Jersey was constructed with federal Treasury Department funds. The building, which was constructed in 1939, is now privately owned.
  • Forest Hill Park Footbridge - East Cleveland OH
    Spanning what is now known as Forest Hills Blvd., the historic pedestrian bridge at Forest Hill Park in East Cleveland, Ohio was constructed with federal Works Progress Administration (WPA) labor. "Spanning 347 feet across a deep valley in the Dugway Brook watershed, the 48-foot-high pedestrian bridge was intended to nestle in the hilly landscape of the Heights (the westernmost foothills of the Appalachians) on Cleveland's east side. Designed by Wilbur Watson and Associates in 1939 with consulting architects F. B. Walker and A. D. Taylor, Forest Hill Park Footbridge was built in 1939-40--the work of more than 1,000 men toiling for two...
  • Frances Slocum State Forest Picnic Area Shelter House - Peru IN
    Stone and concrete foundation, stone and timber walls, hipped roof, and asphalt shingles. Constructed in 1939 by Civilian Conservation Corps (CCC) Co. 589 (encamped at Salamonie River State Forest) on bluff alone Mississinewa River – now overlooking Mississinewa Reservoir (constructed by Army Corps in 1960s).
  • Howell Library - Evansville IN
    Roof Cont: windows, rear brick chimney. Typical mid 20th cen library, completed by the Works Progress Administration (WPA) in 1939.
  • Dunn Memorial Hospital - Bedford IN
    Flat horizontal 2/2 windows, flat alum glass doors, glass block. Birthplace of Edward Rector. Good example of the arch type, has remained virtually unaltered, unusual for a hospital. It was constructed in 1939 by the Public Works Administration (PWA).
  • Bear Creek Lake - Trevlac IN
    This appproximately 7-acre Lake impounding log earth dam, located in Yellowwood State Forest, was complete in 1939 with funds provided by the Works Progress Administration (WPA).
  • War Memorial Building - Jackson MS
    The Art Moderne building was Public Works Administration (PWA) Project Miss. 1279. Along with principal architect E. L. Malvaney, there were 8 architects, the builder/contractor, foundation contractor, and a sculptor who worked on the building.
  • Post Office - Shelton CT
    The historic Shelton, Connecticut post office was constructed in 1939 with federal Treasury Department funds. The building, which houses an example of New Deal artwork, is still in service.