- Started:
- 1941
- Completed:
- 1942
- Quality of Information:
- Good
- Marked:
- No
- Site Survival:
- Extant
Description
The Lamar Boulevard Bridge over Shoal Creek is a reinforced concrete bridge built by the Works Progress Administration (WPA) under project number 65-1-66-2822 in downtown Austin. The bridge has a 40 foot wide roadway and is 145.5 foot long on the downstream side and 187.83 foot long on the upstream side. The project employed an average of 70 workers. The WPA cost was $33,133 and the sponsor cost was $27,649.
The bridge is still in use and is configured with four lanes – two northbound and two southbound.
Source notes
Period Photographs from the National Archives and Records Administration digitized by the Historic Sites and Structures Program, Texas State Parks (Texas Parks and Wildlife Department) (https://www.flickr.com/photos/141324854@N04/25532851383/in/album-72157664269839144/), accessed March 22, 2018.
Site originally submitted by Larry Moore on March 22, 2018.
Contribute to this Site
We welcome contributions of additional information on any New Deal site.
Submit More Information or Photographs for this New Deal Site
Join the Conversation