Photo caption, UVM: “May 8, 1936. Lake Street, WPA Project No. 65-12-336 looking South from intersection of Depot Street. This project consists of widening pavement to twenty four feet with Telford stone base construction, surfacing with a leveling course of penetration macadam varying in thickness from one to four inches and constructing Hot Mix stone filled sheet asphalt wearing surface two inches in thickness.”
Source notes
Burlington Streets: Lake Street, Louis L. McAllister Photographs, Box A05, Folder 10, Item 02, https://cdi.uvm.edu/collections/item/mcalA05F10i02 (accessed May 17, 2017)