- City:
- Yosemite National Park, CA
- Site Type:
- Park Roads and Bridges, Parks and Recreation
- New Deal Agencies:
- Bureau of Public Roads (BPR), Conservation and Public Lands, Public Works Funding, National Park Service (NPS), Public Works Administration (PWA)
- Started:
- 1933
- Completed:
- 1935
- Contractors:
- Farrar and Carlin, Granfield, Granite Construction Company, Nelson & Wallace
- Quality of Information:
- Very Good
- Marked:
- No
- Site Survival:
- Extant
Description
The federal Bureau of Public Roads (BPR), funded by the Public Works Administration (PWA), built the 15.7 mile Glacier Point Road from Chinquapin Flat on the Wawona Road to Glacier Point, 1933-35. This project was part of a complete overhaul of Yosemite National Park roads carried out under the New Deal in the 1930s.
The Glacier Point Road replaced a primitive saddle road built in the 1870s. Surveys for the route were done in 1930-31 and grading began in 1932. Then, funding for the project became available through the National Industrial Recovery Act, which created the PWA.
“The new road was to have easier grades and a wider track than the earlier carriage road. The section between Chinquapin Flat and Bridalveil Creek would be built to the 16′ Forest Highway Standards and would be a full 22′ wide (shoulder-to-shoulder) in fills and cuts.” (Quin)
The Glacier Point Road included a new bridge across Bridalveil Creek, built in 1933. “[The bridge was] designed by the San Francisco office of the Bureau of Public Roads. The bridge was built by contractor Nelson & Wallace of Escalon, California, which submitted the low bid of $10,359.50. The 32′ foot bridge was of steel I-beam construction, and rested on cement rubble masonry abutments. A characteristic example of the NPS ‘rustic style’, the small bridge was designed to appear to be of wooden construction. The steel deck was concealed by yellow pine stringers along the sides, and the guard rail was of yellow and lodgepole pine construction. (Sections of tree trunks have replaced the original rail.)” (Quin 1991)
Glacier Point Road was resurfaced in 1939-40 under the supervision of the BPR (which became the Public Roads Administration in 1939). The work was completed in August 1940 at a cost of $153,251.03.
On 16 October 1940, all park roads built by the BRP/PRA were formally transferred to the National Park Service.
Source notes
Richard Quin, Glacier Point Road, Yosemite National Park. Historic American Engineering Record, HAER NO. CA-157 , 1991
Site originally submitted by Andrew Laverdiere on October 23, 2017.
Additional contributions by Richard Walker.
At this Location:
- South Gate Entrance Station - Yosemite National Park CA
- Hetch Hetchy Dam and Reservoir Expansion - Yosemite National Park CA
- Yosemite and Curry Village Improvements - Yosemite National Park CA
- Tioga Pass Comfort Station - Yosemite National Park CA
- Tuolumne Meadows Campground Contact Station - Yosemite National Park CA
- Tuolumne Meadows Visitor Center (former) - Yosemite National Park CA
- Tuolumne Meadows Campground - Yosemite National Park CA
- Half Dome Climbing Cables Replacement - Yosemite National Park CA
- Tuolumne Meadows Campground Comfort Stations - Yosemite National Park CA
- General Improvements - Yosemite National Park CA
- Trail Improvement and Restoration - Yosemite National Park CA
- Ostrander Ski Hut - Yosemite National Park CA
- Yosemite Valley (Pines) Campgrounds Reconstruction - Yosemite National Park CA
- Seasonal and Stub CCC Camps - Yosemite National Park CA
- Tuolumne River Bridge - Yosemite National Park CA
Site Details
Federal Cost | Total Cost |
---|---|
$153,251.03 | $153,251.03 |