- City:
- Ely, MN
- Site Type:
- Civic Facilities
- New Deal Agencies:
- Public Works Funding, Public Works Administration (PWA)
Description
"This building serves the city of Ely as a community and recreation center. It is three stories and a basement in height and 125 by 78 feet in plan. In the basement are a meeting room, a cafeteria, serving room, and kitchen. The first floor is occupied by a library, a lounge, meeting rooms, a kitchen, office, and work space.
The large auditorium with its stage, meeting rooms, a kitchen, and storage space are on the second floor. The third floor contains the fan room, a projection booth, and storage space.
The floor slabs and stairs are reinforced concrete, and the auditorium is spanned by steel trusses. All exterior walls are faced with stone. An air-conditioning and cooling system made possible the use of glass block panels in lieu of windows.
The building was completed in February 1938 at a construction cost of $208,748 and a project cost of $229,416."
Source notes
C.W. Short and R. Stanley-Brown. "Public Buildings: A Survey of Architecture of Projects Constructed by Federal and Other Governmental Bodies Between the Years 1933 and 1939 with the Assistance of the Public Works Administration." (1939).Site Details
Total Cost |
---|
$229,416.00 |
Contribute to this Site
We welcome contributions of additional information on any New Deal site.
Submit More Information or Photographs for this New Deal Site
This fabulous building was closed to the public by the City of Ely in 2014. It is currently looking for a new purpose. Interested parties should contact the City of Ely, Ely Minnesota, 55731.