“This high school is planned so that when the need arises additions may be made. The present building is T-shaped in plan and two stories in height. It provides seven classrooms, teachers’ rooms, a principal’s office, a chemical laboratory, a library, and a combination auditorium-gymnasium with a stage and bleachers. The auditorium-gymnasium is so arranged that it may be used by the community as well as by the school.
The construction is fireproof throughout. The exterior walls are red face brick with wood trim. The columns at the entrance of the auditorium are limestone.
The volume of the building is 573,780 cubic feet. It was completed in October 1935 at a construction cost of $133,818 and a project cost of $144,915.”
Source notes
C.W. Short and R. Stanley-Brown. "Public Buildings: A Survey of Architecture of Projects Constructed by Federal and Other Governmental Bodies Between the Years 1933 and 1939 with the Assistance of the Public Works Administration." (1939).Site Details
Total Cost |
---|
$144,915.00 |