  • Allegheny County Home and Hospital (former) - Scott Township PA
    The Public Works Administration (P.W.A.) supplied funds to enable additions to what was then the Allegheny County Home and Hospital, later Woodville State Hospital.
  • Allegheny General Hospital - Pittsburgh PA
    "The construction of this hospital plant was begun in 1929 but work was discontinued in 1931 due to financial difficulties. It was resumed in 1935 with the aid of the P.W.A. and when completed covered most of a site of 4 1/2 acres and included a 20-story hospital building, a 9-story nurses' home, and a power-house supplying the entire institution. The hospital building contains 1,200 rooms of which 162 are for private patients, and it increases the total bed capacity of the institution by more than 50 percent. In the plan, all of the departments which are related in service permit...
  • Allegheny River Road Paving - Oakmont / Verona PA
    Pittsburgh's then-new Allegheny River Road (as extended through Oakmont and Verona) was one road paved as part of New Deal efforts: the Public Works Administration (PWA) provided a $212,472 grant for one Allegheny County highway improvement project undertaken in 1937, whose total cost was $466,667. PWA Docket No. PA 1366 STEEL: "Unstated tonnage, construction of county road, Oakmont-Verona boroughs, Allegheny county, Pennsylvania; estimated cost, $472,160. Federal allotment of $212,472 granted." Pittsburgh Press: "Among the six miles of roads to be paved by PWA are the Allegheny River Blvd. extension, Ingomar Road, Buttermilk Hollow Rd., General Logan Blvd. to South Park, and part of the Ohio River Boulevard through...
  • Alma Town Hall Additions - Alma CO
    This building was originally the Alma School. The school was built in 1925. The PWA funded building additions in 1936. The building now serves as the town hall, library and police department.
  • Alsea Bay Bridge (replaced) - Waldport OR
    The bridge over Alsea Bay (mouth of the Alsea River) in Oregon was constructed with funding from the Public Works Administration (PWA) in 1934-36.  It was one of five PWA-funded bridges over Alsea Bay, Coos Bay, Siuslaw River, Umpqua River, and  Yaquina River that completed the Oregon Coast Highway. All but the Alsea River bridge still stand. The coast highway was developed after 1914 by the state and county highway departments, but money ran out in the Great Depression before the job could be finished.  With the advent of the New Deal, the PWA offered $1.4 million and a loan of...
  • Alta Loma Elementary School - Los Angeles CA
    Alta Loma Elementary School, which opened in 1915, was rebuilt with funding from the Public Works Administration (PWA) between 1934 and 1935. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation, Board of Education member Arthur Eckman told the Los Angeles Times, “I am sure that every member of the board agrees with...
  • Amagansett School - Amagansett NY
    Amagansett, New York's then-new school building was constructed in 1936 with the aid of a $76,000 PWA grant. The building opened Jan. 1937 and it is still in use today.
  • Amarillo College: Ordway Hall - Amarillo TX
    Ordway Hall at Amarillo College was constructed as a New Deal project. Sometimes mis-attributed to the Works Progress Administration (WPA), it was the Public Works Administration (PWA) that provided a $73,116 grant for the project, whose total cost was $162,547. Construction occurred between 1936 and 1937. P.W.A. Docket No. Tex. 1499 "Architect Guy Carlander designed this administration building for Amarillo College. It was built in 1936-37 and later named for George Ordway, who with James Guleke obtained legislative authority to establish the school; Ordway later became the first president. The L-plan building consists of an auditorium and a two-story classroom and office wing with 19...
  • Amarillo College: Russell Gymnasium - Amarillo TX
    The Russell Gymnasium at Amarillo College in Amarillo, Texas was undertaken with the assistance of funds provided by the Public Works Administration (PWA) during the Great Depression. Text From the state historical marker reads: "The administration building and the gymnasium were the first two permanent structures built for Amarillo College. Originally known as Badger Gymnasium for the school's athletic teams, this facility was renamed to honor Dr. Natalie Russell, who fostered women's physical education at the college. Architect Guy Carlander designed the building, erected in 1937-39 with Public Works Administration funding. The steel and brick gymnasium includes a two-story central space surrounded...
  • Ames High School - Ames IA
    The Federal Emergency Administration of Public Works (Public Works Administration) funded the construction of the Ames High school. Today, the building serves as the Ames City Hall.
  • Amherst Central High School - Amherst NY
    Amherst Central High School was constructed by the PWA in the early 1930s.
  • Amon Carter-Riverside High School - Fort Worth TX
    This was one of five monumental senior high schools built in Fort Worth with the aid of New Deal programs. It was designed by Fort Worth architect Wyatt C. Hedrick in an eclectic Spanish Baroque style and features yellow brick and a clay tile roof. Funding for the building came through the Public Works Administration (PWA). The grounds of the school were landscaped by Hare & Hare of Kansas City, Missouri, with the work implemented by the Works Progress Administration (WPA). The heavily-treed campus includes a band shelter with stage that was built by the WPA.  The school has been...
  • Anacostia Interceptor Sewer and Pumping Station - Washington DC
    In fiscal year 1934, the DC Government reported that the Public Works Administration (PWA) had allotted $1,759,500 for five sewer projects in the District: northeast boundary sewer, Piney Branch relief sewer, outfall sewer, upper Potomac interceptor, and upper Anacostia main interceptor and pumping station. The initial PWA allotment for the Anacostia Interceptor and pumping station was $231,000. This was significantly reduced, however, after Maryland decided to limit its pollution into the Anacostia River by building treatment plants in the general area of the proposed Anacostia Interceptor. In March 1934, the Peter D’Amato Construction Company was awarded a contract for $47,504 to install...
  • Anacostia Park: Swimming Pool - Washington DC
    In 1936, the Public Works Administration (PWA) provided $69,036 for the construction of a swimming pool in Anacostia Park (about $1.3 million in 2020 dollars). The pool was built by the BZ Contracting Company of New York and completed in early 1937. It was reported that, “The new pool will accommodate about 500 swimmers” (Evening Star, January 24, 1937). In 1949, Anacostia Pool was the scene of fighting when black youths attempted to use the facility, which was formally not segregated but, in practice, used exclusively by whites. A pro-segregation group was irritated when white members of the “Young Progressives” handed...
  • Andes Central School - Andes NY
    Andes Central School in Andes, New York was constructed with the aid of federal Public Works Administration (PWA) funds. The PWA provided a $90,000 grant for the project, whose total cost was $209,677. Construction occurred between Nov. 1936 and Oct. 1937. PWA Docket No. NY 8577-D
  • Andrew Jackson Courts - Nashville TN
    The Andrew Jackson Courts public housing complex was undertaken in Nashville, Tennessee  following the passage of the Housing Act of 1937 and establishment of the United States Housing Authority (USHA). The USHA worked in conjunction with the Public Works Administration (PWA) in providing funds for local housing development projects, two of which were the segregated communities of Cheatham Place and Andrew Jackson Courts. The rowhouse appearance, clustered two-story houses were constructed for African American residents. The 398 unit buildings cost $1,890,000. They remain in use today.
  • Andrew Jackson Elementary School - Altadena CA
    Andrew Jackson Elementary School was rebuilt by the Public Works Administration in 1935. It was one of 27 schools in the Pasadena Unified School District to be either rebuilt, demolished, or reinforced by the PWA or the Works Progress Administration (WPA) following the 1933 Long Beach earthquake.  
  • Andrew Jackson High School (former) - Cambria Heights NY
    The presently multi-campus Campus Magnet High School(s) was constructed as Andrew Jackson High School during the 1930s. The federal Public Works Administration (PWA) provided more than $1,000,000 in financial assistance to enable the project to move forward. The PWA Docket number was NY 8024-R. The exterior of the school consisted of brick and limestone. "Most of the doors and windows are wood, and the Main Entrance doors are bronze," a PWA report said. "The building has three stories and a basement. The plan is a combination H and E in shape. Its frame is built of steel with reinforced concrete arches....
  • Angela Boulevard Bridge - South Bend IN
    In 1938, the St. Joseph County Board of Commissioners applied to the Public Works Administration (PWA) for funding to expand the Angela Boulevard Bridge, a critical link for motorists traveling to the Notre Dame stadium for football games. After receiving $45,000 and starting construction, however, faulty work in the original bridge necessitated a new structure, contractor, and additional funding. In 1939, the commissioners appealed again to the PWA and were awarded $76,500, with the county paying the rest of the $152,000 total cost. Remnants of the first bridge were destroyed with explosives that shook the entire neighborhood, but that was...
  • Angeles Mesa Elementary School Renovation - Los Angeles CA
    Angeles Mesa Elementary School, which opened in 1917, was renovated with funding from the Public Works Administration (PWA) between 1934 and 1935. In January 1934, the PWA allocated $9,380,000 to the Los Angeles Unified School District for the rehabilitation of schools damaged in the severe 1933 Long Beach earthquake.  One hundred and thirty schools would benefit from the system-wide loan and grant, with 2,500 men to be employed in rehabilitation work over 21 months. Upon receiving news of the PWA allocation, Board of Education member Arthur Eckman told the Los Angeles Times, “I am sure that every member of the board agrees with...
  • Angier School (former) Addition - Newton MA
    The former (since demolished) historic Angier School building Newton, MA received an addition using federal Public Works Administration (P.W.A.) funds in 1936.
  • Ann J. Kellogg School Addition - Battle Creek MI
    "Cooperating with the PWA which provided 45 percent of the cost ... construction work was started on additions to the Ann J. Kellogg school ...," in Battle Creek, Michigan.
  • Annadale Railway Station - Staten Island NY
    The Annadale station of the Staten Island Railway was redeveloped during the late 1930s, as one link in a large grade crossing removal project sponsored by the Public Works Administration (PWA). Work included construction of a new station house on Annadale Road, which is still in use.
  • Annadale Road Overpass - Staten Island NY
    The bridge carrying Annadale Road over the newly sunken Staten Island Railway was built in 1938, as one link in a large grade crossing removal project sponsored by the Public Works Administration (PWA).
  • Ansonia Middle School - Ansonia CT
    Originally built as Ansonia High School, what is now the Ansonia Middle School was constructed in 1937 with the assistance of federal Public Works Administration (P.W.A.) funds. The building has since been modified. "The plan of this building is a departure from the customary school plan. The auditorium is separated from the classroom wing by an open porch, above which are classrooms. The building contains 24 classrooms, administrative offices, a small clinic, a gymnasium, and an auditorium seating 752 students and having a well-equipped stage. The shape of the structure allows extensive playing fields on the property.   The construction consists of...
  • Antietam National Battlefield - Sharpsburg MD
    The Battle of Antietam took place on September 17, 1862, and is known as the bloodiest day of the Civil War.  General George B. McClellan and his Union forces faced off against General Robert E. Lee and his Confederate Army at Sharpsburg, Maryland.  When the fighting was done, well over 3,500 men were dead, and another 19,000 wounded. Throughout the New Deal period, Antietam National Battlefield received a large amount of attention, funding, and work from the CWA, PWA, and WPA.  The CWA placed a historical survey group there, circa 1933-34; the PWA funded restoration of large buildings and monuments, such...
  • Appalachian State University Development - Boone NC
    Appalachian State University, then known as Appalachian State Teachers College (A.S.T.C), was substantially improved and developed as part of infrastructure and building construction projects on the institution's campus. Numerous New Deal organizations, including the Civil Works Administration (CWA), Federal Emergency Relief Administration (FERA), Works Progress Administration (WPA), and Public Works Administration (PWA), provided labor or funding for the numerous projects undertaken at A.S.T.C. during the Great Depression. At A.S.T.C the CWA: conducted landscaping work; provided office help and laborers; repaired buildings; and installed a chlorinator (presumably for a pool). The FERA: constructed a gymnasium and a library; repaired a basement at...
  • Appalachian State University: Power and Heating Plant (demolished) - Boone NC
    The Public Works Administration (PWA) provided financial support for the revamping of the "power plant and heating systems" of what was then known as Appalachian State Teachers College in Boone, North Carolina. The PWA provided a grant of $14,178 for the project, whose total cost was $33,860. Work occurred between Dec. 1937 and Jun. 1938. Per The Charlotte Observer, the contract for the work was awarded to Bagwell Plumbing and Heating of Durham. Living New Deal believes the (most likely-demolished) facility to be located at the south end of campus, on University Drive, by what is now the site of the...
  • Appalachian State University: Smith-Wright Hall - Boone NC
    The Public Works Administration (PWA) provided a grant for the construction of a new science building: Smith-Wright Hall at what was then known as Appalachian State Teachers College in Boone, North Carolina. The cornerstone identifies 1939 as the year construction started, as well as the PWA project number and notable figures. The building was completed in 1940. PWA Project No. N.C. 1473-F
  • Aptos Middle School - San Francisco CA
    Constructed with PWA funds.
  • Arborway Water Main - Boston MA
    The following water main was laid as part of a Public Works Administration (P.W.A.) project: "Arborway, from Pond and Prince streets, to Forest Hills street ..."
  • Arcade-Victoria School (demolished) - Rock Hill SC
    The federal Public Works Administration (P.W.A.) contributed to the development of Rock Hill's Arcade-Victoria School. "School buildings and classroom additions went up at Central School, Northside School, Arcade-Victoria School, and Ebenezer Avenue School, with A. D. Gilchrist the architect for all these PWA projects." The former Arcade-Victoria School has since been demolished.
  • Archer City High School - Archer City TX
    Funded by the Public Works Administration, the school cost $42,000. This work was supervised by W. J. Walker of the Olney PWA office, who supervised the Jermyn School construction.
  • Arcola School - Sterling VA
    Built with funding from the Public Works Administration in 1939, Arcola School represented an upgrade in school facilities standards by providing a separate room for every grade. The four-room school replaced the one-room rural school school typical of rural areas. This was part of a larger school modernization effort across the United States. Arcola School was built during an era of segregated public schools and was the county's first elementary school for white students. From a 2009 nomination form of the Virginia Landmarks Register and the National Register of Historic Places": "This building was a school within the Loudoun County Public School System until 1977 and was then...
  • Arizona State Capitol Annex Building - Phoenix AZ
    The Public Works Administration (PWA) funded the construction of the State Capitol Annex Building in 1938. The University of Arizona Libraries Digital Collections information page on State Capitol murals mentions that PWA funds were used "to hire Jay Datus to paint a series of murals entitled 'The Pageant of Arizona Progress.' Datus came to Arizona in 1937 at the age of 23, already an accomplished and well-known artist. He spent two years in research for these works in order to accurately depict the dress and actions of his subjects. His figures include Native Americans, miners, explorers, missionaries and pioneers." According to C.W....
  • Arizona State University Development - Tempe AZ
    The Public Works Administration (PWA) funded the construction of several new facilities at the Arizona State Teachers College in Tempe – today's Arizona State University. The New Deal improved many college campuses, including the University of Arizona in Tucson and Phoenix College.  Teachers' Colleges were often targetted. The building shown here is probably the back of West Hall, now covered by other buildings and the reception is surely in the lounge of West Hall. Known buildings have their own project pages.  Matthews Hall appears to be New Deal, but it is not certain.  More information regarding the location and status of all New Deal...
  • Arizona State University: Cafeteria - Tempe AZ
    The Public Works Administration (PWA) funded the construction a cafeteria building at the Arizona State Teachers College in Tempe (today the Arizona State University). The exact location of the cafeteria and its fate are unknown to the Living New Deal. It has probably been demolished.
  • Arizona State University: Central Heating Plant (demolished) - Tempe AZ
    The Public Works Administration (PWA) funded the construction of the central heating plant at the Arizona State Teachers College in Tempe (today the Arizona State University).  The site was cleared in 2019 for a large hotel-retail complex.
  • Arizona State University: Golf Course - Tempe AZ
    There is a record in the National Archives of the Public Works Administration (PWA) funding the construction of a golf course at the Arizona State Teachers College in Tempe (now the Arizona State University).  It is unclear what kind of golf course is meant and where it was located, and the picture shows students putting behind a campus building – not a golf course at all.  There was a true golf course built northeast of the ASU campus, but apparently much later.  Further information is needed to verify the history of this golf course.
  • Arizona State University: Matthews Center - Tempe AZ
    The Public Works Administration (PWA) funded the construction of the old Matthews library building at the Arizona State Teachers College in Tempe.  It presently serves as the Matthews Center on the campus of today's Arizona State University. The building is a low (two-story) brick building in neo-classical style. It has a large footprint, no doubt to accommodate book stacks in the past.  It is unclear how much modification has been made for its new life as The Matthews Center.   