Ethan Allen Park Roads – Burlington VT

Photo caption, UVM: “This view shows Ethan Allen Park drive as seen from the pinnacle. This drive is being constructed with 8″ telford stone sub base, 4 inches of stabilized sand and stone base and 1 1/4 inch of armor… read more

Ethan Allen Park Entrance – Burlington VT

The Works Progress Administration (W.P.A.) constructed a masonry entrance at the south end of Ethan Allen Park. The W.P.A. also widened the entrance to 26 feet (W.P.A. Project No. 65-12-344).