1 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 142
  • Nantasket Beach Hotel (former) Renovations - Hull MA
    "The hotel at Nantasket Beach was renovated and painted by the Civil Works Administration in 1934, "floors reconditioned, furniture cleaned and varnished and the outside of building painted. Labor was paid for from Federal Funds, but a large portion of the materials was furnished by the state."  
  • University of Vermont: Converse Hall South Wing Remodel - Burlington VT
    The National Youth Administration (NYA) renovated and remodeled the south wing of Converse Hall at the University of Vermont. The newly remodeled wing served as cooperative living quarters for male students. Pictured with the NYA sign is Lee Arthur, the supervisor of the project.
  • Enosburg School Facilities - Enosburg VT
    The Works Progress Administration built tennis courts, an ice rink, and a shelter house for the School in Enosburg.  
  • Otter Creek Flood Control - Proctor VT
    The Works Progress Administration completed flood control work on Otter Creek in Proctor.
  • Rutland Fire Department Addition - Rutland VT
    The Works Progress Administration built an addition for the Rutland Fire Department in Rutland, Rutland County. The addition housed a recreation room, dormitories, a kitchen and a library.
  • Saint Albans Grade School - Saint Albans VT
    The Works Progress Administration built the Saint Albans Grade School. The condition of this structure is unknown to the Living New Deal.
  • Saint Albans High School Athletic Field (former) - Saint Albans VT
    The Works Progress Administration built a new athletic field for the Saint Albans High School. Per commenter Paul Chandler, "This looks to be Coote Field which was located just east of Stevens Brook between Lake Street and Lower Weldon Street. Across the brook was Houghton Park—later used by the high school soccer team. ... he athletic fields no longer exist at that location."
  • Cedar City High School - Cedar City UT
    The Public Works Administration funded the construction of the Cedar City High School in Cedar City, Iron County School District. Docket # 1033-R (Utah).
  • Plymouth Grade School - Plymouth UT
    The Public Works Administration funded the construction of the Plymouth Grade School in Plymouth, Box Elder County. Docket # 1018-R (Utah). The architect of record was J. Nelson.
  • Bear River High School - Tremonton UT
    The Public Works Administration funded the construction of the Bear River High School, in Tremonton, Box Elder County. Docket # 1018-R (Utah). The architect of record was J. Nelson. The condition of this structure is unknown to the Living New Deal.
1 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 142