• Ballona Creek Channel - Los Angeles CA
    The US Army Corps of Engineers played an instrumental role in developing this important Los Angeles urban waterway.  Much of the creek was "channelized", i.e.,  lined with concrete, as part of a massive flood-control project undertaken by the Army Corps of Engineers and the Los Angeles County Flood Control District following the great Los Angeles flood of 1938. Ballona Creek is short river in southwestern Los Angeles County that drains an area exending from the Santa Monica Mountains on the north, the Harbor Freeway (I-110) on the east, and the Baldwin Hills on the south. It flows through Culver City and...
  • Ballona Creek Channel: Culver Blvd. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...
  • Ballona Creek Channel: Duquesne Ave. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...
  • Ballona Creek Channel: Higuera St. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...
  • Ballona Creek Channel: La Cienega Blvd. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...
  • Ballona Creek Channel: Lincoln Blvd. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...
  • Ballona Creek Channel: Overland Ave. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...
  • Ballona Creek Channel: Washington Blvd. Bridge - Los Angeles CA
    The federal government in the form of the US Army Corps of Engineers played an instrumental role in developing the Ballona Creek waterway in Los Angeles, which helps drain the Los Angeles basin from the Santa Monica Mountains to the Pacific Ocean. The section from the Pacific Ocean to Vista del Mar was started in 1938 and completed in 1939. The Vista del Mar to La Salle Ave section was started in 1935 and completed in 1936. The La Salle Ave. to Washington Blvd. section was started 1938 and completed 1939. The Washington Blvd. to Redondo Blvd. section was started in...