• Bismarck High School - Bismarck ND
    The Public Works Administration (PWA) provided funding for construction of Bismarck High School in Minnetonka, Minnesota. The New Deal facility was a replacement for a 1912 high school structure. The building is still presently used as Bismarck High School, with major additions in 1962-63, 1987, and 2018-19; this said, the exterior (along N 7th Street) and main lobby still retain the original character. Construction was partially funded as a federal New Deal project through the Public Works Administration (PWA), which allotted $308,700 of the $404,000 cost. It was the largest PWA project in North Dakota at the time of completion in...
  • Shelly School (Former) - Shelly MN
    The Works Progress Administration built the Shelly School in Shelly MN in 1938. According to Docomomo, the structure is a "andsome schoolhouse built in Art Deco style with Streamline Moderne elements such as rounded corners and ample glass block. Build under the Works Progress Administration (WPA) of the federal New Deal, replacing a two-story wooden school. The brick structure cost approximately $46,000. Closed in 1993, reopened in 2000 as the Red River History Museum and Norman County Historical Society."
  • Norcross Public School (former) - Norcross MN
    The former Norcross Public School at 17568 Norton Ave S opened as a public school in 1938, operated until c. 1970s. As of 2021 being marketed as a residential project, but needs a total restoration. According to Docomomo, the structure is an "Art deco school built under the Works Progress Administration (WPA) of the federal New Deal, replacing a two-story wooden school. The brick structure cost approximately $46,000. Closed in 1970s." In 2020, it was listed for sale as a potential 3500-3800 sq. ft. residential adaptive reuse.
  • Jasper School Addition - Jasper MN
    Here's the summary I wrote for the Docomomo US MN listing on our registry, heavily borrowing from the application linked below: Original section built in 1911 (designed by W.E.E. Greene of Luverne; Builder: Boyd Construction Co.; cost: $30,000), four additions in 1939, 1956, 1960, and 1965; the richness and beauty of the rose-colored Sioux quartzite stone itself (also called Jasper stone) provides the visual character of the building, laid in broken ashlar; the substantial, Moderne-style 1939 addition (designed by Perkins & McWayne of Sioux Falls; Cost: $125,000, with $45,135 in New Deal funds via the Public Works Administration) on the south...
  • Westport School - Westport MN
    The Works Progress Administration built the Westport School in Westport MN. The structure has a simple, Moderne exterior. Most windows have since been bricked up. Minnesota Historical Society has a photo from initial construction from the Works Progress Administration Collection. That collection "provides numerous views of WPA projects around the state of Minnesota" along with very old photographs (clearly not the case for the relevant imafge here). The town peaked in population in 1940 (104) and since declined to half that amount by 2010, with its post office shutting down in 1966.