• Eureka Grade School (former) - Eureka UT
    The Public Works Administration (PWA) funded the construction of the old Eureka Grade School in Eureka, Utah. The school was probably completed in 1939. The main two-story building and accompanying single story structure were designed by the architecture firm of Scott and Welch. The contractor of record was Tolboe & Tolboe. The style is brick Moderne, with a curved front on the smaller of the two buildings. The old grade school has been supplanted by a new Eureka Elementary School next door.  The main building of the old school is still being used for Adult School classes in 2023. The smaller building...
  • Grand County Courthouse - Moab UT
    The Grand County courthouse was completed in June 1937 and dedicated on July 2.  It cost $60,000, with half the money coming from the Public Works Administration (PWA) and half from local bonds (Firmage, p. 289).  It is still in use as a courthouse.  
  • Myton Grade School (demolished) - Myton UT
    The Public Works Administration (PWA) funded the construction of the Myton Grade School in Myton NV for the Duchesne County School District. The school was designed by the architecture firm Scott and Welch. The contractor of record was Tolboe & Tolboe. The New Deal school, which was constructed c. 1939, has been replaced in recent years by a new structure at the same site.    
  • School Addition - Roosevelt UT
    The Public Works Administration (PWA) and the Works Progress Administration funded the construction of an addition to a school building in Roosevelt, Duchesne County, Utah. (The town is named after T.R. not FDR) The school addition was designed by the architecture firm Scott & Welch and the contractor of record was Tolboe & Tolboe. The photograph from the National Archives does not specify the name of the school, but there may well have only been only one in Roosevelt at the time.  But, having viewed all the schools in Roosevelt UT in 2022, we are sure that this school building has since been...