• Gymnasium (former) - Meridian MS
    The two-story red-brick former gymnasium was constructed by the Federal Emergency Administration of Public Works (later the PWA) in 1936-1937. It retains its original massing and pedimented parapet. It was renovated in 1964 to become a first floor library and second floor science laboratories/classroom space.
  • Macon City Hall - Macon MS
    The small, one-story, red-brick Colonial Revival building was constructed as Federal Emergency Administration of Public Works (later renamed the PWA) Project Miss. 1366-F. It is part of the Macon Historic District. Mississippi architects P. J. Krouse and L. L. Brasfield, from Meridian designed the building. It was constructed by Mississippi builder/contractor John L. McLemore of Meridian.  
  • Meridian High School - Meridian MS
    The "Stripped Classic, Art Moderne" (Mississippi Department of Archives and History) 2 story brick with limestone trim building was completed for a construction cost of $591,489 and project cost of $688,195 (Short & Stanley-Brown, 1939, p. 216). The project also included a separate gym, which was converted into a library in 1964, and Ray Stadium, the adjoining sports field. The school is still a functioning high school. From contributor Susan Allen: Ray Stadium features "two steel-reinforced concrete stadium bleachers facing each other are set in a man-made slope. The bleachers are supported at the rear by concrete columns attached with segmental...