- Kearney High School Addition (demolished) - Kearney NEIn June 1934, the PWA presented a grant to the Kearney School Board for a $7,000.00 addition to the existing high school. Architect John P. Helleberg was hired to prepare specifications for the project, which would include rearranging the building to provide additional classroom space and a more convenient plan on the second floor. One valuable change to the high school was a new chemistry laboratory that could accommodate thirty students at one time. The existing large assembly hall was repurposed as a library and study hall. New bathrooms and lockers were also provided. The project cost approximately $24,000.00, with...
- Shelton School Auditorium & Gym - Shelton NEThe Public Works Administration (PWA) announced a number of projects in May 1937 which were designed to improve or eliminate conditions in schools that might be regarded as hazardous to students’ lives. Shelton was given a grant of $30,900.00 to build an addition to the school that would provide more room for students and alleviate an overcrowding hazard. Work on Shelton’s new $32,000 school addition began on May 2, 1938. The project included an auditorium/gymnasium wing measuring 60 by 100 feet in size, and a Smith Hughes vocational and shop wing, 30 by 80 feet. J. P. Helleberg of Kearney served...