• Arkabutla Reservoir Project - Coldwater MS
    The Arkabutla Dam and reservoir project was the second of three projects for flood control management of the Yazoo-Tallahatchie-Coldwater river systems in Mississippi. The Army Corps of Engineers directed the $10,000,000 project. In order to construct the dam and reservoir, the town of Coldwater had to be relocated a mile further south. Approximately 700 residents were relocated at a cost of $250,000. The earthen dam is 11, 500 feet long, average of 67 feet high, and 482 feet wide at the base. Contracts were let to H. N. Rodgers & Son, Forcum-James, and Pioneer Contracting. Patton-Tully Transportation was awarded a...
  • Deweyville Swing Bridge - Deweyville TX
    The Deweyville Swing Bridge is built over the Sabine River where Texas State Highway 12 and Louisiana Highway 12 meet. The bridge is a deck plate girder swing design. The 160 foot main span pivots on top of a central pillar. Congress passed the Emergency Relief Appropriation Act on April 8, 1935. This act gave states grant money for road and bridge construction. The bridge opened on March 10, 1938. The bridge is opened manually by workers using a massive T-wrench inserted in a hole in the middle of the bridge and turned. Regular openings of the bridge ceased in the 1960s...
  • Post Office - Lawrenceburg TN
    The Lawrenceburg post office was completed in 1935 with Louis A. Simon as supervising architect and John W. Wolcott Jr. as architect. The original building is a "symmetrical five-by brick building" and has been extended with an addition that is in sympathetic design. Concrete American eagle medallions are inset above the windows on either side of the fanlight above the entrance doors. Replicas of the eagle medallions are also above 2 of the windows on the extension. Contractors were Forcum-James of Dyersburg.