1 2 3 4 5 6 7 8 9 10 11 12 13 14 49
  • Shelter and Picnic Facilities - Mount Kearsarge NH
    The Civilian Conservation Corps built a shelter and picnic facilities at Mount Kearsarge between 1933-1942.
  • Cuivre River State Park - Troy MO
    Established as the Cuivre River Recreation Demonstration Area in 1934 by the National Park Service. Civilian Conservation Corps (CCC) Company 3771 built roads and structures throughout the park. The park was turned over to the state of Missouri in 1946 to become Cuivre River State Park. The park features many CCC structures still in use such as a one-lane stone bridge, a stone picnic shelter, and group camps. The structures are included in 2 National Historic Districts.
  • Kerwin Brook CCC Camp - Wesley ME
    The Civilian Conservation Corps built the Kerwin Brook CCC Camp in the unincorporated area T36 MD BPP, in the vicinity of Wesley ME. 160th Company Kerwin Brook Camp (Wesley, Maine) October 1939 – June 1942 Excerpt from “In The Public Interest – The Civilian Conservation Corps In Maine” by Jon A. Schlenker, Norman A. Wetherington, Austin H. Wilkins. In October 1939, the 160th Company moved from Stow, Maine to Wesley Maine to establish the Kerwin Brook Camp. During the months from July to August, the cadre erected four barracks, a kitchen and mess hall, officers' and foreman's quarters, washrooms and toilets, a classroom building,...
  • Bridgton CCC Camp Co. 1124 - Bridgton ME
    The Civilian Conservation Corps built the Bridgton CCC Camp Co. 1124 in Bridgton ME. "History of the 1124th Company. Civilian Conservation Corps. On June 1st, 1935, Lt. J. L. Fearer arrived in Bridgton with a cadre of 23 men from the Rangeley Camp No. 2107, and Bridgton Camp No. 11005 was officially begun. For a time the Cadre was quartered in the "Exposition Building" of the Bridgton Agricultural Association. The members of the cadre worked diligently, and under Lt. Fearer' s direction civilian carpenters rushed the construction of the buildings. Lt. F. R. Blaisdell, Jr. was assigned to the Company on June 23,...
  • Eagle Bend School - Eagle Bend MN
    In December 1939 the Eagle Bend School burned down, causing $110,000 in damage and destroying a gymnasium constructed by the Public Works Administration in 1934. While deliberating on new construction on January 31, 1940, the members of the Eagle Bend School Board applied for $52,000 of Works Progress Administration (W.P.A.) funding to complete the rebuilding of the school. Blueprints were drawn by architect, E.F. Broomhall from Duluth, MN., and A.C. Dunn was the W.P.A. area engineer. The project employed a variety of local laborers and businesses to supplement W.P.A. labor. Carpenters Gust Berggren and Olof Edmonds received an additional 50-cent per...
  • Trails - Big Cottonwood Canyon UT
    Civilian Conservation Corp (CCC) company 3340 worked out of camp F-38 at the mouth of Big Cottonwood Canyon, Salt Lake County UT, from the summer of 1935 through 1942. The hundreds of CCC enrollees assigned to camp F-38 during those years built many trails in lower Big Cottonwood Canyon.  These are the ones locally attributed to the CCC: On the south side moving up the canyon, there are two short and three long trails up the ridge between Big Cottonwood and Little Cottonwood Canyons: Storm Mountain trail (short, unmarked); Lake Blanche trail (formerly Mill B South Fork); Donut Falls/Cardiff Pass/Kessler Peak trails...
  • Syphax Houses Community Building - Washington DC
    The Alley Dwelling Authority (ADA) funded the construction of a community building for the Syphax Houses and surrounding area, ca. 1942. It is unknown to the Living New Deal if this building still exists. The ADA was one of the earliest New Deal initiatives to provide better housing for low-income Americans. It replaced unsafe alley dwellings in Washington, DC with more modern and affordable houses and apartments. The ADA existed from 1934-1943 as a federally controlled special authority. It then slowly evolved into today’s DC Housing Authority, an independent agency of the DC Government. The Syphax Houses Community Building was part of the...
  • Highland Dwellings Community Building - Washington DC
    The Alley Dwelling Authority (ADA) funded the construction of a community building for the Highland Dwellings and surrounding area, ca. 1942. It is unknown to the Living New Deal if this building still exists. The ADA was one of the earliest New Deal initiatives to provide better housing for low-income Americans. It replaced unsafe alley dwellings in Washington, DC with more modern and affordable houses and apartments. The ADA existed from 1934-1943 as a federally controlled special authority. It then slowly evolved into today’s DC Housing Authority, an independent agency of the DC Government. The Highland Dwellings Community Building was part of the...
  • Frederick Douglass Dwellings Administration and Community Building - Washington DC
    The Alley Dwelling Authority (ADA) funded the construction of an administration and community building for the Frederick Douglass Dwellings and surrounding community, ca. 1940-1942. It is unknown to the Living New Deal if this building still exists. The ADA was one of the earliest New Deal initiatives to provide better housing for low-income Americans. It replaced unsafe alley dwellings in Washington, DC with more modern and affordable houses and apartments. The ADA existed from 1934-1943 as a federally controlled special authority. It then slowly evolved into today’s DC Housing Authority, an independent agency of the DC Government. The Frederick Douglass Dwellings Administration and...
  • High School - Bruce MS
    Work Projects Administration approved funding for construction of a new school building in Bruce. The poured-in-place concrete building was designed by E. L. Malvaney in his monolithic concrete trademark, International design, and two stories. The school district pledged $22,072 toward the project that employed approximately 75 men for almost a year. The combined gymnasium and auditorium and classrooms for the Bruce High School cost $60,518 with work scheduled for November 2 construction. A destroyed the front entrance and a portion of the auditorium in the 1970s and that section of the building was rebuilt with brick, in contrast to the...
1 2 3 4 5 6 7 8 9 10 11 12 13 14 49