1 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 49
  • Hamilton Metz Field - Brooklyn NY
    In April 1942, the WPA and the Department of Parks completed the reconstruction of Hamilton Metz Field in Brooklyn. After removing an existing football field and other facilities, the WPA constructed extensive new facilities: "The area has been completely enclosed by chain link fence, a portion of which, along the north and south property lines, is set on new concrete retaining walls. These structures have permitted the grading and paving of level play surfaces. Two gate controlled entrance stairways from Lefferts Avenue will provide access to the one and one quarter acre grass surfaced athletic field, at the west end of...
  • Bensonhurst Park - Brooklyn NY
    The bulk of present day Bensonhurst Park was first established in 1895. Two further parcels were added later. In 1942, the WPA completed major work on the park: "The Department of Parks announces the completion of work in connection with the reconstruction of Bensonhurst Park and the addition of a new playground, baseball fields and other recreation facilities… The old park area has been increased in size. Fifteen acres were added at the time that the Belt Parkway was constructed. This was done by pumping sand beyond the seawall which was erected at the outshore end of the property… The two previously undeveloped...
  • Bath Beach Park - Brooklyn NY
    Bath Beach Park, named for the surrounding neighborhood, was acquired by the City in 1937. In 1941-1942, the WPA completed extensive work on the park. A press release announcing the opening explained: "Located on a knoll on the center line of 17 Avenue extended is a semi-circular overlook sitting area commanding an unobstructed view over Gravesend Bay and the Lower New York Bay. A concrete ramp skirts the brick surfaced retaining wall which supports the overlook and connects with a 30 foot wide tree and bench lined mall... The smaller western section which is subdivided into six use areas by fencing, benches...
  • Gravesend Park Playground - Brooklyn NY
    On May 25, 1942 the Parks Department announced the completion of a major reconstruction of the Gravesend Park Playground in Brooklyn. After removing much outdated equipment, the WPA constructed significant new facilities: "The new development permits greater utilization of space by segregation of smaller compact use areas equipped with increased facilities. A central tree shaded bench lined mall extends from the main park gate to the existing comfort station which has been given a new setting of block paving, trees and a flagpole. On both sides of the mall two main fence enclosed sections, approximately 1 acre each, are subdivided into various...
  • John Jay Park Pool and Bathhouse - New York NY
    Today's NYC Parks site explains: "The swimming complex was opened in stages between 1940 and 1942 as part of a massive Work Projects Administration (WPA) capital construction program. The outdoor swimming pool was opened in 1940 and measured 50 by 145 feet. Legend has it that Parks Commissioner Robert Moses required the pool to be five feet short of the length necessary for 150-foot sprints. In 1941 the bathhouse was remodeled and reopened with an auditorium, large recreation room, gym, and changing facility which could accommodate 1,002 male and 590 female bathers. Systems were installed to filter, purify, and re-circulate...
  • Runnels County Sheriff's Office - Ballinger TX
    The National Youth Administration constructed the building that houses the Runnels County Sheriff's Office between 1941 and 1942.
  • Federal Building Mural - Provo UT
    Provo's J. Will Robinson Federal Building houses a New Deal mural, "Early and Modern Provo," by Everett C. Thorpe, completed in 1942.  The work was commissioned by the federal Treasury Section of Fine Arts for what was then the main Provo post office.
  • Montana State Arsenal, Armory, and Drill Hall - Helena MT
    In 1885, the Montana Territorial Legislature authorized the organization of a National Guard. Within three years its nine companies were headquartered in the territorial capital at Helena. Since that time Montana Guard personnel have been called up for State Active Duty to assist with riots, strikes, natural disasters, law enforcement, search and rescue, and other emergencies. Montana citizen soldiers mustered into federal service for military actions including the Spanish American War in 1898, the Philippine Insurrection in 1899, World War I France, throughout World War II's Pacific Theatre, the Korean and Vietnam conflicts, the Persian Gulf War, Bosnia and Kuwait,...
  • Flood Control and Range Conservation - Grand County UT
    The Civilian Conservation Corps (CCC) was quite active in Grand County, Utah.  Four CCC camps were established in and around Moab, the county seat.  The first was the Warner Lake Camp, F-20, in 1933 under the US Forest Service, which also ran camp PE-214.  These camps worked principally on road construction and flood control on Mill Creek.   The biggest and longest lived of the CCC camps in the county was the Dalton Wells Camp, DG-32, running from 1935 to 1941.  That camp operated under the Division of Grazing of the General Land Office (predecessor of the Bureau of Land Management), working around...
  • Middle Village Playground - Middle Village NY
    The NYC Parks website explains the provenance of this modest playground in Queens: "Between 1935 and 1938, Parks leased this property from the Gorbess Realty Corporation. In April 1938, the City of New York purchased one parcel of the property for $10,450. A month later, the city acquired the second parcel through condemnation, and Parks assumed jurisdiction over both areas." During the same period, the land was developed by Parks with New Deal support. First, in September 1935, Parks announced the opening of a playground with "two handball courts and the usual children's play facilities." In 1942, after the park had...
1 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 49