  • School Gymnasium - Dieterich IL
    The Work Project Administration constructed a gymnasium at what is now the Dieterich Junior-Senior High School complex, in 1939. The facility was designed by Deal & Deal of Lincoln, Illinois and can be found the west side of Pine Street, just north of Church Street.
  • Bright Angel Trail and Shelters - Grand Canyon National Park AZ
    The Civilian Conservation Corps (CCC) conducted development work at Grand Canyon National Park, 1933-42, including extensive reconstruction work on the Bright Angel Trail, completed in 1939. The National Park Service's CCC Walking Tour says that: " began a major reconstruction of the trail. With help from the CCC, the NPS completed the work in 1939. The early trail was only two to three feet (less than one meter) wide in spots. With pick, shovel, drill, and dynamite contractors and the CCC boys rerouted and reconstructed the trail to its present four to six foot (1.2 – 2 m) width. During the same...
  • School Gymnasium - Rocksprings TX
    A school gymnasium in Rocksprings, Texas was constructed in 1938-9 with the assistance of Public Works Administration (PWA) funds. The PWA supplied a $14,265 grant for the project, whose total cost was $30,986. Construction began in Sept. 1938 and was largely completed in May 1939. The building is set back from the street (U.S. 377), located largely behind the Gilmer Memorial Library. PWA Docket No. Tex. 1495
  • Montlake Boulevard Pedestrian Overcrossing - Seattle WA
    A Public Works Administration grant helped to fund construction of the Montlake Boulevard Pedestrian Overcrossing on the campus of the University of Washington. The bridge provided a safer pedestrian connection between the main part of the campus west of Montlake Boulevard and the university's main athletic facilities east of Montlake Boulevard, including Husky Stadium and the University of Washington Pavilion, later renamed to Hec Edmundson Pavilion. Construction of the bridge began in late 1938 and was substantially completed by February of 1939. The total cost of the project was $22,349, of which 45% was paid by the PWA. The remainder...
  • Arizona Snowbowl Road - Flagstaff AZ
    The New Deal helped construct the 9-mile road from Fort Valley Road (Highway 180) to the Arizona Snow Bowl ski area on Mt. Agassiz in the San Francisco Peaks, northwest of Flagstaff AZ. In the winter of 1938, the 20-30 Club, a Flagstaff service group, held a "snow carnival" on the southwest slope of Mt. Agassiz. It was so successful that the group ran a contest to choose a name for the area, and "Arizona Snow Bowl" was selected. The Coconino National Forest managers saw the opportunity to help advance the ski resort and offered to build a better access road up...
  • Northern Arizona University Improvements - Flagstaff AZ
    The Public Works Administration (PWA) gave the Arizona State Teachers College a grant of $105,000 and a loan of $313,000 to build housing on the campus – today's Northern Arizona University in Flagstaff.  These were North Hall, expansion of Taylor Hall and Cottage City (see links to these projects at right).  The grant and loan also provided for the  installation of a new heating system for the campus and fire escapes for all buildings.   In addition, a Civil Works Administration (CWA) project in 1933-34 allowed the campus to fence the athletic field and build bleachers, add roads and curbs, and remove an old...
  • Northern Arizona University: Cottage City (demolished) - Flagstaff AZ
    The New Deal provided the funds to build a large group of cottages for student housing – known as "Cottage City" – at what was then Arizona Teachers' College.   The Public Works Administration (PWA) made a grant of $57,900 and the state of Arizona added $20,000 to build 50 2-room cottages.  Construction was done in 1939 by 60 Civilian Conservation Corps (CCC) enrollees (no doubt from the Mt. Elden camp).  The units were small at 25x14 feet, built with rock walls and cement floors, plus running water.  There were three additional buildings for laundry and showers. More cottages were added...
  • Del Monte Wash Bridge - Cottonwood AZ
    The Works Progress Administration (WPA) built a short bridge on North Main Street across Del Monte Wash in Cottonwood AZ.   The bridge is concrete dressed with the same river stone from the Verde River as the nearby Cottonwood Community Club building and was almost certainly built at the same time, 1938-39.  It is mentioned on the historical plaque in front of the Community Club.
  • Grace Sparkes Activity Center - Prescott AZ
    The Prescott National Guard Armory was built from 1936 to 1939 by the relief workers of the Works Progress Administration (WPA). Today, it is called the Grace Sparkes Activity Center and the Prescott Parks and Recreation offices are located on the lower floor. The former armory is a large building constructed of reinforced concrete that was meant to provide a large interior hall for drills.  The exterior is sheathed with cut native stone. Sandstone lintels are used over windows set deeply into the walls. The front entrance features a medieval style gate over the double doors and different color and pattern of stone...
  • St. Joseph Fire Station #7 (former) - St. Joseph MO
    Originally constructed as St. Joseph Fire Station Number Seven, the building at 919 Corby Street was constructed with the aid of federal Public Works Administration (PWA) funds. The station was moved across the street from an earlier firehouse just across N 10th Street. According to a 1988 article in the St. Joseph News-Press: "According to the brass plaque beside the double bay doors, Station 7 was built by the Federal Works Agency, Public Works Administration, in 1939."