1 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 118
  • Vocational Building - Ecru MS
    "The Ecru High School FFA/FHA Building was built in 1938 by the National Youth Administration (NYA), a New Deal agency. The NYA was created by executive order in 1935 to provide vocational training to young people while also furnishing a stipend allowing participants to remain in school. One NYA project involved building and renovating school buildings. There were a number of NYA built school buildings in Mississippi, primarily used for vocational education. However, that number is declining. The Ecru building, clad in 'native stone,' retains its exterior features, including pent awnings over the doors and 9/9 double hung sash windows....
  • Post Office - St. Clair MI
    Constructed with New Deal funds in 1937-8. "Of contemporary design, the building has brick exterior walls with stone trim and wood windows. Granite steps and a platform with railings and lamp standards mark the front of the entrance. At the rear of the structure are the usual vestibule and a platform for the reception of mail and a mailing drive with space for parking postal automobiles. A flat composition roof covers the building. Foundation walls and the floor slab are concrete. In general the building is fireproof" (The Port Huron Times Herald, 1938). As of 2011, the St. Clair Post Office will...
  • Post Office - Columbus WI
    Constructed by the Treasury Department in 1938.
  • School Wall - Valley View TX
    This sandstone wall was built by the WPA between 1937-38 in Valley View, Texas, about 60 miles north of Dallas/Fort Worth. From 2013: An upcoming school bond to build a security fence places the wall in danger. A campaign is underway to save it. 2016 update from contributor Andy Hogue: "The wall has been preserved! As part of 2016 school renovation and expansion projects, the Valley View School Board decided to place the new security fence on the inside of the wall (closest to the school). Repairs were made in some of the more deteriorated places and new capstones were added. A...
  • Senatobia High School - Senatobia MS
    Senatobia High School was FEAPWA Project #Miss. 1260, constructed in 1938 in an Art Moderne style. Additions were completed in 1959 and 1965. The auditorium is 1.5-story, and constructed of reinforced concrete and with brick and stone veneer. The entry to the auditorium is separated by pilasters featuring bas-relief sculptures and a sun dial above glass block lights.
  • Community House - Eupora MS
    The stone veneer facade, one-story stone and brick Community House was constructed with Work Progress Administration funding in 1938. One room of the Community House was designated for a library in 1966. The first known library in the county was established in the courthouse through the federal Works Progress Administration (WPA) during the Great Depression but was in existence only eight months.
  • Borough Hall - Closter NJ
    "Closter Borough Hall, erected in 1938, was a triumph of effort and cooperation between our local leaders of that time and the able workforce provided by the federal Works Progress Administration (the “WPA”). Its style is described as Art Deco/Moderne, or “WPA Moderne,” a label which denotes both the aesthetic elements of the architecture and its practical origins... Architect Carl G. Mettberg designed the building, and the WPA labor to construct it was provided at very little cost (25% of its actual value). A ceremonial laying of the cornerstone took place on March 12, 1938... Some stylistic details which are make this...
  • Steuben House Renovations - River Edge NJ
    The Steuben House is a longstanding historical and architectural landmark in Bergen County NJ. Its style recalls the Bergen Dutch community. The house was occupied for military purposes during much of the American Revolutionary War, including by General Washington. During the 1930s, New Deal workers renovated the house, helping preserve the historic structure up to this day: "On June 20, 1938, a crew of WPA workmen began a $20,000 renovation of the Steuben House (the New Jersey Historic Sites Commission contributing $3,000 and the WPA supplying $15,800 worth of labor to the project). A new oil heating system, a bath and lavatory...
  • Post Office - Fort Lee NJ
    The historic post office in Fort Lee, New Jersey was built with Treasury Department funds. Completed in 1938, the building houses a wonderful example of New Deal artwork.
  • Sunken Garden Theater Expansion - San Antonio TX
    "The theater originally was constructed in 1930 and expanded and renovated in 1937 using Texas Centennial funding. The architect for the 1930 project was Harvey P. Smith, who was joined by George Willis and Charles T. Boelhauwe to design the 1937 project. The old quarry wall forms the western (back) edge of the theater site, providing an open-air setting with natural acoustic features. The 193- design included stage and classical wings, while the 1937 expansion added dressing rooms and stage support buildings, restrooms, seating, and a concrete floor for the seating area. The 1937 project was constructed by WPA workers, while...
1 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 118